Grassy Creek Connector
Greenway in Indiana
Runs through Indianapolis · Marion County
Conditions now
Loading the weather near Indianapolis city (balance)…
Forecast by the National Weather Service for Indianapolis city (balance) · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Grassy Creek Connector is the name OpenStreetMap gives to a paved path of about 2.1 miles (3.4 km) on the far east side of Indianapolis, Marion County, that runs from Mitthoeffer Road past Grassy Creek Park to Carroll Road. Those are the endpoints Weekly View gives for the Grassy Creek Greenway, a 1.6-mile (2.6 km) trail whose opening Mayor Joe Hogsett and the Department of Public Works celebrated on June 29, 2026; the paper puts the cost of this first phase at $3.3 million. The Central Indiana Community Foundation says the project had support from its Connected Communities initiative, funded by a Lilly Endowment grant, and that future phases will add a four-mile (6.4 km) extension south to the IndyGo Blue Line and the Pennsy Trail. Weekly View says the second phase, linking the park at 30th Street to the Pennsy Trail, could see construction as soon as 2031.
In May 2025 Indy Parks announced that it and the Department of Public Works would build an expanded Grassy Creek Trail, funded by the foundation through the Lilly Endowment grant. OpenStreetMap tags the mapped ways asphalt and designated for bicycles; one way carries an old railway operator tag of NYC and sits beside ways named Old NYC Line and tagged as abandoned railway.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Castleton 2 S, 9.5 km from the trail's middle, 8 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 41 51 64 74 82 85 83 77 65 52 40 Low °F 20 23 32 42 52 62 65 63 56 44 34 25 Precipitation, in 3.3 2.7 3.9 4.6 4.9 5.6 4.7 3.9 3.6 3.4 3.5 3.2 Snow, in 8.4 7.2 3.6 0.2 0 0 0 0 0 0 0.6 6.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1952 Cumberland sheet (1:24,000); the 1962 Cumberland sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Buck Creek Trail 1.8 mi away · 2.7 mi, paved
- Pennsy Trail 3.0 mi away · 18.4 mi, paved
- 38th Street Multi-Use Path 3.7 mi away · 3.2 mi, paved
- Harrison Trace Trail 3.9 mi away · 2.8 mi, paved
- Fall Creek Trail 4.0 mi away · 14.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Mayor Hogsett, Indy Parks Open new Grassy Creek Park Amenities — Indy Parks & Recreation · government source · checked Oct 31, 2026 Supports: Indy Parks and DPW to build an expanded Grassy Creek Trail; funded by the Central Indiana Community Foundation through a Lilly Endowment grant
- Indy's Grassy Creek Greenway Opens New Connection to Environmental Education — Central Indiana Community Foundation · organization · checked Oct 31, 2026 Supports: opening celebrated June 29, 2026; trail runs 1.6 miles; support from the foundation's Connected Communities initiative, made possible by a Lilly Endowment grant; future work to add a four-mile extension south to the IndyGo Blue Line and the Pennsy Trail
- New Greenway on Far East Side Opens — Weekly View · web · checked Oct 31, 2026 Supports: opening celebrated Monday, June 29 by Mayor Hogsett, a city-county councilor and Indy DPW; first phase 1.6 miles; Mitthoeffer Road to Carroll Road with Grassy Creek Park in between; $3.3 million for phase 1; phase 2 to the Pennsy Trail from the park at 30th Street, construction as soon as 2031
- Grassy Creek Connector — OpenStreetMap way 1225012193 · web · checked Oct 31, 2026 Supports: OSM name Grassy Creek Connector; asphalt cycleway designated for bicycles; old_railway_operator=NYC tag on this way; neighbouring ways Old NYC Line (railway=abandoned, ways 312640184 and 1391811330)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.