Green Crescent Trail
Greenway in South Carolina · OpenStreetMap relation
Runs through Clemson University, Clemson and Central · Pickens County
Conditions now
Loading the weather near Clemson…
Forecast by the National Weather Service for Clemson · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- C-11 mile 0 directions to C-11
- Parking at Pi Rho Court mile 0.1 directions to trailhead 2
- C-1/R-5 mile 0.4 directions to C-1/R-5
- R-4 mile 0.6 directions to R-4
- Parking at Commons Court mile 0.7 directions to trailhead 5
- Parking at Perimeter Road mile 0.7 · restrooms directions to trailhead 6
- R-2 mile 0.8 directions to R-2
- R-1 mile 1 directions to R-1
- Parking at Kite Hill Drive mile 1 directions to trailhead 9
- Parking at Perimeter Road mile 1.2 directions to trailhead 10
- Parking at Vineyard Road mile 1.3 directions to trailhead 11
- Parking at Rippleview Drive mile 2.3 directions to trailhead 12
- Parking at Azalea Drive mile 2.3 directions to trailhead 13
- Parking at Clemson Park Road mile 2.9 directions to trailhead 14
- Parking at Berkeley Drive mile 3.4 directions to trailhead 15
Plan your visit
- By trainAmtrak: Clemson, SC (CSN) 1.0 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Green Crescent Trail is a growing network of walking and biking paths in Clemson, South Carolina, planned to link Clemson's city parks with Clemson University and later Central and Pendleton. The idea began in 2010 with a Clemson University architecture class, "Community 1:1", that came up with the name and concept; residents took it up in 2014, and the Friends of the Green Crescent, a 501(c)(3) nonprofit formed in 2015, advocates for the trail. The City of Clemson, the Town of Central and the university build its segments. It is a greenway network, not a rail-trail, and this record maps about 4 miles of it.
The first piece, the Green Crescent Pedestrian Bridge, opened on November 10, 2017; it runs beside Berkeley Drive and carries the trail over Highway 123. A 2.6-mile segment from Clemson University to Clemson Elementary, connecting Gateway Park and Clemson Park, officially opened on November 24, 2023, built partly on easements from Clemson United Methodist Church and the South Carolina Department of Transportation. It meets the university through new paths built with the Perimeter Road upgrades; Clemson University described its part as a 10-foot-wide, 1.2-mile multiuse path for pedestrians and cyclists, making a 3.2-mile connection between the city, the South Carolina Botanical Garden and campus.
The community goal is 15 miles of connected trail by 2030. In 2026 the City of Clemson was building a 1.5-mile path along Berkeley Drive between Frontage Road and Issaqueena Trail, widening the sidewalk from about 4.5 feet to 10 feet, with completion expected in early 2027, and work continued on the College Avenue streetscape downtown. In Central, a 0.635-mile sidepath on Highway 93 between downtown and Tarrant Street was under contract for completion by November 30, 2026. OpenStreetMap maps the record's paths as asphalt and concrete.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Clemson Univ, 2.7 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 65 73 81 88 91 90 84 74 64 56 Low °F 32 35 41 48 57 65 68 68 62 50 40 34 Precipitation, in 4.9 4.4 4.8 4.2 4.1 4.2 4.1 5.3 3.8 3.8 3.9 5.1 Snow, in 0.8 0.8 0.3 0 0 0 0 0 0 0 0 0.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Pickens sheet (1:125,000); the 1951 Clemson sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Green Crescent Trail
- FacebookGreen Crescent Trail (Facebook)
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17215137, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Area experts share the vision of a new Perimeter Road as a gateway to campus and beyond — Clemson News, May 25, 2022 · organization · checked Oct 16, 2026 Supports: University portion is a 10-foot-wide, 1.2-mile multiuse path for pedestrians and cyclists; links to the city trail at Gateway Park; 3.2-mile connection between the city, the South Carolina Botanical Garden and the university
- Home — Green Crescent Trail (Friends of the Green Crescent) · organization · checked Oct 16, 2026 Supports: growing network of pedestrian and biking trails in the Clemson, Central, Pendleton area; Green Crescent Pedestrian Bridge opened November 10, 2017, parallel to Berkeley Drive, spanning Hwy 123, first segment of the trail; 501(c)(3) nonprofit
- About — Green Crescent Trail · organization · checked Oct 16, 2026 Supports: idea began with a Clemson University class; residents took it up in 2014; Friends of the Green Crescent formed in 2015 as a 501(c)(3) nonprofit; network of walking and biking paths in the Clemson-Central-Pendleton area
- 15x30 Update: Berkeley Drive breaks ground soon — Green Crescent Trail, July 6, 2026 · organization · checked Oct 16, 2026 Supports: goal of 15 miles of connected trail by 2030; College Avenue streetscape work by the City of Clemson; Berkeley Drive 1.5-mile sidepath; Town of Central Hwy 93 sidepath of 0.635 mile from downtown Central to Tarrant St., contract completion by November 30, 2026
- New trail on Berkeley Drive — Green Crescent Trail, October 5, 2026 · organization · checked Oct 16, 2026 Supports: City of Clemson 1.5-mile multi-use path between Frontage Road and Issaqueena Trail, funded and built by the city; sidewalk widened from about 4.5 to 10 feet; completion expected early 2027; connects into existing Green Crescent Trail
- Green Crescent Trail: from class project to concrete reality — The Tiger, November 30, 2023 · web · checked Oct 16, 2026 Supports: 2.6-mile segment from Clemson University to Clemson Elementary officially opened November 24, 2023, at Gateway Park; connects Gateway Park and Clemson Park; easements from Clemson United Methodist Church and SCDOT; access to the university via paths from the Perimeter Road upgrades; 2010 architecture class 'Community 1:1' created the name and concept
- Green Crescent Trail (relation 17215137) — OpenStreetMap · web · checked Oct 16, 2026 Supports: record length of about 4 miles; asphalt and concrete surfaces
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.