States › Iowa

Greenhill Trail

Greenway in Iowa

Runs through Cedar Falls and Waterloo · Black Hawk County

Conditions now

Loading the weather near Cedar Falls…

Forecast by the National Weather Service for Cedar Falls · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.8 mi 7.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Fountains Way mile 0.3 directions to trailhead 1
  2. Parking at Fountains Way mile 0.3 directions to trailhead 2
  3. Parking at Greenhill Road mile 1.1 directions to trailhead 3
  4. Parking at Bluebell Road mile 1.1 directions to trailhead 4
  5. Parking at Greenhill Road mile 2.2 directions to trailhead 5
  6. Parking at Greenhill Road mile 2.3 directions to trailhead 6
  7. Parking at Greenhill Road mile 2.8 directions to trailhead 7
  8. Parking at Lovejoy Drive mile 2.9 directions to trailhead 8
  9. Parking at Greenhill Road mile 3 directions to trailhead 9
  10. Parking at Greenhill Road mile 3 directions to trailhead 10
  11. Parking at Greenhill Road mile 3 directions to trailhead 11
  12. Parking at Sager Avenue mile 3.5 directions to trailhead 12
  13. Parking at Greenhill Road mile 3.7 directions to trailhead 13
  14. Parking at Greenhill Road mile 4 directions to trailhead 14
  15. Parking at Maynard Avenue mile 4.2 directions to trailhead 15
  16. Parking at Maynard Avenue mile 4.2 directions to trailhead 16
  17. Parking at Pleasant Valley Drive mile 4.4 directions to trailhead 17
  18. Parking at Rainbow Drive mile 4.6 directions to trailhead 18
  19. Parking at Greenhill Road mile 4.6 directions to trailhead 19
C.A. Rownd Round Barn, beside the trail (opens in a new tab)
C.A. Rownd Round Barn, beside the trail · Photo: RifeIdeas · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Greenhill Trail is a concrete side path of 4.68 miles along Greenhill Road in Black Hawk County, Iowa, and part of the trail network of Waterloo and Cedar Falls. Several of the trails it links use former railroad corridors, but the Greenhill Trail is built beside the road. A grass berm separates it from traffic for most of its length, and chain-link fence does so in several stretches.

TrailLink gives its end points as Greenhill Road at Rainbow Drive and Greenhill Road at Hudson Road. At the Rainbow Drive end it meets the South Riverside Trail, which follows the south bank of the Cedar River into Cedar Falls and Waterloo, and the smaller, unpaved Trolley Trail. Along the way the path passes through Valley View Park, which has play and picnic areas, restrooms and water fountains, and several schools lie within reach of it. At El Dorado Heights Park it meets the Cedar Prairie Trail, a tree-lined route into Cedar Falls. The trail continues a short distance west to Hudson Road, just past another City of Cedar Falls park; a few blocks north, the Hudson Road Trail runs through the campus of the University of Northern Iowa.

Parking and restrooms are at Valley View Park on Maynard Avenue, just past its intersection with Greenhill Road, near the northeastern part of the trail. More parking is at Miriam's Park on Sager Avenue, south of Greenhill Road and east of Progress Avenue, and on-street parking may be available at El Dorado Heights Park. The Cedar Prairie Trail has a trailhead with restrooms and parking about half a mile south of El Dorado Heights Park, at Quesada Avenue and Kael Trail. The trail is open to bicycling, inline skating and walking and is listed as wheelchair accessible.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Waterloo Municipal Airport, 6.5 km from the trail's middle, 21 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283346617382858377634734
Low °F111527385061646152402817
Precipitation, in1.11.1244.65.74.34.23.12.81.91.4
Snow, in10.19.34.61.70.100000.33.19.9
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Waterloo sheet (1:250,000); the 1963 Hudson sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenhill Trail — TrailLink · web · checked Oct 15, 2026
    Supports: 4.68 miles, concrete, Black Hawk County, built beside Greenhill Road with berm and fence, end points, connections to the South Riverside, Trolley, Cedar Prairie and Hudson Road trails, Valley View Park amenities, schools, El Dorado Heights Park, parking at Valley View Park, Miriam's Park and El Dorado Heights Park, Cedar Prairie trailhead, permitted uses

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.