Greens Bayou Greenway
Greenway in Texas · OpenStreetMap relation
Runs through Houston · Harris County
Conditions now
Loading the weather near Houston…
Forecast by the National Weather Service for Houston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Thomas Bell Foster Park mile 0.1 directions to trailhead 1
- Parking at Maxey Road mile 1.2 directions to trailhead 2
- Maxey Road Park & Ride mile 1.4 directions to Maxey Road Park & Ride
- Parking at High Ridge Street mile 2.1 directions to trailhead 4
- Parking at North Green River Drive mile 5.6 directions to trailhead 5
- Parking mile 6.5 directions to trailhead 6
- Parking mile 6.5 directions to trailhead 7
- Parking mile 6.5 directions to trailhead 8
- Parking mile 6.5 directions to trailhead 9
- Parking mile 6.5 directions to trailhead 10
- Parking mile 6.5 directions to trailhead 11
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Greens Bayou Greenway is a hike-and-bike trail and linear park along Greens Bayou in northeast Houston, Texas, built by the nonprofit Houston Parks Board with the City of Houston Parks and Recreation Department under Bayou Greenways 2020, a $220 million public-private program to complete a 150-mile network of parks and trails along Houston's major bayous. Greens Bayou rises in northwest Houston and runs southeast to the Ship Channel past neighborhood parks including Thomas R. Wussow, City View, Brock, Maxey and Thomas Bell Foster. The greenway's groundbreaking was celebrated in January 2018. This record maps about 4.0 miles in the section north of Maxey Road. It is a bayou greenway, not a rail-trail.
A 1.4-mile segment between Strickland Park and Maxey Park, begun in June 2018 and announced complete in May 2019, added a 10-foot-wide concrete trail, a connection into the METRO Park and Ride on Maxey Road, a mid-block crossing on Woodforest Boulevard, an eagle-themed gateway at Maxey Park and, at Strickland Park, new parking, a canoe and kayak launch and a bobcat-themed gateway; it cost $2.4 million. The Parks Board's plans for the greenway also include pedestrian bridges, paved and natural trails and a hike-and-bike bridge across Halls Bayou to Brock Park.
In October 2021 the Parks Board completed 3.3 miles of Hunting Bayou Greenway from Manitou Drive to Maxey Road, connecting Hunting Bayou to Greens Bayou at Maxey Park for the first time. That link uses TxDOT's widened sidewalks on Maxey Road, which also connect Maxey Road Park with Greens Bayou Drive, where the greenway continues toward Thomas Bell Foster Park. The record shows parking at the Maxey Road Park and Ride and off North Green River Drive.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston-Port, 11.3 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 63 67 73 79 86 91 93 94 90 82 72 65 Low °F 44 49 54 61 69 75 77 77 72 63 53 46 Precipitation, in 4 2.8 3.8 5.2 5.1 7.9 4.5 3.4 4.5 5.4 3.4 4.3 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Fauna sheet (1:24,000); the 1955 Jacinto City sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationHouston Parks Board — Greens Bayou
Nearby trails
- Hunting Bayou Greenway within 0.2 mi · 5.0 mi, paved
- Halls Bayou Greenway Trail within 0.2 mi · 10.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14862381, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greens Bayou — Houston Parks Board · organization · checked Oct 15, 2026 Supports: course of Greens Bayou from northwest Houston to the Ship Channel, parks along it, January 2018 groundbreaking, planned kayak launch, pedestrian bridges, paved and natural trails, Halls Bayou bridge to Brock Park
- New trail openings along Greens, Hunting, and Sims Bayou Greenways (May 15, 2019) — Houston Parks Board · organization · checked Oct 15, 2026 Supports: 1.4-mile Strickland Park to Maxey Park segment, construction began June 2018, 10-foot concrete trail, METRO Park and Ride connection, Woodforest Boulevard mid-block crossing, Maxey and Strickland park improvements, $2.4 million; Bayou Greenways 2020 as a $220 million, 150-mile program with Houston Parks and Recreation
- Houston Parks Board Completes Connection of Hunting Bayou Greenway to Greens Bayou Greenway (October 7, 2021) — Houston Parks Board · organization · checked Oct 15, 2026 Supports: 3.3 miles Manitou Drive to Maxey Road, first trail connection of Hunting Bayou to Greens Bayou at Maxey Park, TxDOT widened sidewalks on Maxey Road, connection from Maxey Road Park to Greens Bayou Drive toward Thomas Bell Foster Park
- Greens Bayou Greenway — OpenStreetMap relation 14862381 · web · checked Oct 15, 2026 Supports: mapped length and extent; parking at Maxey Road Park and Ride and North Green River Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.