Greenville Recreational Rail Trail
Rail-trail in New Hampshire · OpenStreetMap relation
Runs through Greenville and Wilton · Hillsborough County
Conditions now
Loading the weather near Greenville…
Forecast by the National Weather Service for Greenville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
Plan your visit
- MapNew Hampshire rail trails pamphlet (PDF) New Hampshire State Parks
Links checked Oct 18, 2026. Sources: New Hampshire State Parks.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Greenville Recreational Rail Trail is a rail trail in Greenville and Mason, New Hampshire, about 2.2 miles long from the east side of Route 31 in Greenville to Pratt Pond in Mason; 2.2 miles are mapped here. It is managed by the New Hampshire Bureau of Trails with the Department of Transportation's Bureau of Rail and Transit, and the Wilton Lyndeboro Winter Wanderers help maintain it. The corridor is the north end of the former Peterborough and Shirley Railroad, a spur off the Fitchburg line that reached the New Hampshire border by 1850 and ended in the center of Greenville just past a steel trestle over the Souhegan River. The last regularly scheduled passenger train ran in July 1933.
The trail runs through a heavily wooded corridor in Russell State Forest, past small brooks and ponds fed by the Souhegan River, including Pratt Pond. At its Mason end it continues south as the Mason Railroad Trail toward the Massachusetts line, together forming a route of about 8.6 miles. At the Greenville end the railroad's 624-foot bridge over the valley is gone and only abutments remain; the trail ends at them, about 0.2 miles past a parking area on Adams Hill Road.
The surface is packed earth, gravel and sand, with rough and muddy stretches toward Greenville. The state lists mountain biking, hiking, cross-country skiing, snowshoeing, dog mushing, snowmobiling and off-highway recreational vehicles among its uses, and dogs must be leashed. There are no designated lots along most of the trail; parking is at road crossings, where the state asks visitors not to block gates, and in a lot on Pratt Pond Road.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 68% of this route as a trail on former railroad right-of-way.
Greenville and Greenville Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
83% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Greenville 1 NNE, 0.8 km from the trail's middle, 49 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 34 42 55 66 74 79 78 70 58 46 36 Low °F 14 15 22 33 42 52 58 56 49 38 30 20 Precipitation, in 3.4 3.3 4.2 4.3 3.7 4.3 3.6 3.8 4.2 5.4 4.1 5 Snow, in 19.2 19.2 15.7 2.9 0 0 0 0 0 0.4 1.9 16.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1900 Peterboro sheet (1:62,500); the 1953 Peterborough sheet (1:62,500) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 3
Nearby trails
- Mason Railroad Trail within 0.2 mi · 7.5 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17937661, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenville Recreational Rail Trail — New Hampshire State Parks (Bureau of Trails) · government source · checked Oct 13, 2026 Supports: Route 31 in Greenville to Mason, about 2.2 miles, Bureau of Trails, Wilton Lyndeboro Winter Wanderers, ponds fed by the Souhegan River, permitted uses, parking at road crossings without blocking gates
- Greenville Line History — Squannacook River Rail Trail · organization · checked Oct 13, 2026 Supports: Peterborough and Shirley spur off the Fitchburg line, New Hampshire border by 1850, end in Greenville center past a steel trestle over the Souhegan, last regularly scheduled passenger train July 1933
- Greenville Recreational Rail Trail — Trail Finder · web · checked Oct 13, 2026 Supports: NH DOT Bureau of Rail and Transit co-management, ends near Pratt Pond in Mason, Russell State Forest, surface, leashed dogs, Pratt Pond Road lot
- Mason & Greenville Rail Trails, NH — Trailspotting · web · checked Oct 13, 2026 Supports: combined route of about 8.6 miles with the Mason trail, 624-foot bridge gone with abutments remaining, trail ending 0.2 miles past the Adams Hill Road parking area, rough and muddy stretches
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.


