Greenway Belt Path
Greenway in Colorado · OpenStreetMap relation
Runs through Denver · Denver County
Conditions now
Loading the weather near Denver…
Forecast by the National Weather Service for Denver · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Spruce Street mile 0 directions to trailhead 1
- Parking at North Syracuse Street mile 0.4 directions to trailhead 2
- Parking at North Xanthia Court mile 1 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Greenway Belt Path is a 1.7-mile concrete shared-use path in Denver's Central Park neighborhood, the former Stapleton neighborhood built on the site of Stapleton International Airport, which closed in 1995. The neighborhood took the name Central Park after a residents' vote in 2020, and its plan set aside about 1,100 acres of parks and open space, with a trail network that reached 38 miles by 2011. No city page naming the path was found; the name comes from OpenStreetMap.
The path starts at East Montview Boulevard near North Syracuse Street and runs north and then east through Greenway Belt Park, passing near Fred Thomas Park and Puddle Jumper Park and going under North Central Park Boulevard in a short tunnel. Its east end, near East 26th Avenue and North Beeler Street, meets the Westerly Creek Trail.
OpenStreetMap maps it as a designated bicycle and foot path, mostly concrete with asphalt near the east end, and groups it as a local bicycle route.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Denver-Stapleton, 2.1 km from the trail's middle, 8 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 46 48 56 62 72 84 90 88 80 67 55 46 Low °F 18 19 27 34 43 53 59 57 48 36 26 18 Precipitation, in 0.5 0.5 1.1 1.7 2.3 1.7 2.1 1.8 1.5 1 0.7 0.5 Snow, in 6.4 7.6 8.8 6.2 1.4 0 0 0 0.8 3.9 7.3 6.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 East Denver sheet (1:125,000); the 1957 Derby sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Westerly Creek Trail within 0.2 mi · 8.5 mi, paved
- Sand Creek Regional Greenway 0.7 mi away · 13.9 mi, paved
- Sand Creek Trail 1.1 mi away · 10.8 mi, paved
- Tollgate Creek Trail 1.8 mi away · 6.7 mi, paved
- High Line Canal Trail 2.8 mi away · 63.1 mi, paved
- 56th Avenue Trail 3.4 mi away · 6.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18670288, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Central Park, Denver — Wikipedia · organization · checked Oct 17, 2026 Supports: former Stapleton airport closed 1995; renamed Central Park by 2020 vote; about 1,100 acres of parks and open space planned; 38 miles of trails by 2011
- Relation: Greenway Belt Path (local bicycle route) — OpenStreetMap · web · checked Oct 17, 2026 Supports: route relation, designated bike/foot, concrete and asphalt surfaces
- Way: Greenway Belt Path (tunnel) — OpenStreetMap · web · checked Oct 17, 2026 Supports: tunnel under North Central Park Boulevard
- Way: Greenway Belt Path — OpenStreetMap · web · checked Oct 17, 2026 Supports: south end near East Montview Boulevard and North Syracuse Street
- Way: cycleway at Westerly Creek Trail — OpenStreetMap · web · checked Oct 17, 2026 Supports: east end junction with the Westerly Creek Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.