Gull Lake Trail
Greenway in Minnesota · OpenStreetMap relation
Runs through Nisswa, Lake Shore, Fairview Township (Cass County) and East Gull Lake · Crow Wing and Cass counties
Conditions now
Loading the weather near Lake Shore…
Forecast by the National Weather Service for Lake Shore · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at County Road 77 Southwest mile 11 directions to trailhead 1
- Parking at Cobbenwood Way mile 14.5 directions to trailhead 2
- Parking at Interlachen Road mile 16.3 directions to trailhead 3
- Parking at Interlachen Road mile 16.7 directions to trailhead 4
- Parking at Interlachen Road mile 16.7 directions to trailhead 5
- Parking at South Main Street mile 20.6 · restrooms directions to trailhead 6
- Parking at South Main Street mile 20.6 · restrooms directions to trailhead 7
(opens in a new tab) About this trail
The Gull Lake Trail is a paved, multi-use trail of about 21 miles that circles Gull Lake in the Brainerd Lakes Area of Minnesota, connecting four communities: East Gull Lake, Fairview Township, Lake Shore and Nisswa. Each community builds its own segment, and much of the money has come from Legacy grants awarded through the Greater Minnesota Regional Parks and Trails Commission. Lake Shore drew up a master plan for the trail in 2014, which the chair of Nisswa's trail steering committee credited with getting the project started. The trail is used year-round.
Fairview Township's share of the loop is 7.8 miles; the township was finishing its last segment in June 2024. In Lake Shore the trail follows County State Aid Highway 77, partly as a separate path beside the road and partly as a widened shoulder. Nisswa's 3.5 miles run along Hazelwood Drive and Lower Roy Lake Road to the tunnel under Highway 371 into downtown Nisswa, where riders can join the Paul Bunyan State Trail; the city also lists connections to Nisswa Lake Park and the Pillsbury State Forest. A ribbon-cutting on June 6, 2024 marked the opening of the Nisswa and Lake Shore sections.
The last pieces lie along County State Aid Highway 77 between Lake Shore and Nisswa, a stretch described in 2023 as running from the Bar Harbor Supper Club over the Gull Lake Narrows to the Nisswa city line. Rising costs put Nisswa's final segment on hold after its first grant, and in late 2024 the city planned to build its remaining 0.8 mile in 2025. Lake Shore's remaining segment, less than a mile long, received a $2,528,591 Legacy award in December 2024, with construction expected in 2026.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Gull Lake Dam, 4.3 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 18 24 36 51 65 75 79 77 68 53 37 24 Low °F -1 3 16 31 45 56 61 59 49 36 22 8 Precipitation, in 0.6 0.6 1.2 2.4 3.4 4.1 4.4 3.3 2.7 2.6 1 0.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Pillager sheet (1:62,500); the 1953 Brainerd sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Paul Bunyan State Trail within 0.2 mi · 105 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18518767, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Gull Lake Trail: Nisswa Connection, Proposal 2024-007 — Legislative-Citizen Commission on Minnesota Resources · government source · checked Oct 14, 2026 Supports: 21-mile trail; Nisswa working with three other communities; three and a half miles of trail in Nisswa; final segment along CSAH 77 put on hold by cost increases; connections to the Paul Bunyan State Trail, Pillsbury State Forest and Nisswa Lake Park
- Gull Lake Trail's near completion celebrated in Nisswa — Brainerd Dispatch (June 12, 2024) · press · checked Oct 14, 2026 Supports: June 6, 2024 ribbon-cutting for Nisswa and Lake Shore; trail circles Gull Lake through Nisswa, Lake Shore, Fairview Township and East Gull Lake; used year-round; tunnel under Highway 371 into downtown Nisswa and the Paul Bunyan Trail; Lake Shore 2014 master plan; Nisswa segment on Hazelwood Drive and Lower Roy Lake Road; Nisswa's remaining 0.8 mile along CSAH 77 planned for 2025; GMRPTC grants; Fairview Township finishing its last segment, grand opening June 29
- Gull Lake Trail edging closer to completion in three communities — Pineandlakes Echo Journal (January 28, 2023) · web · checked Oct 14, 2026 Supports: paved, multi-use trail totaling 21 miles connecting four communities; Fairview Township 7.8 miles; Lake Shore trail detached from CSAH 77 plus widened shoulder; remaining stretch from Bar Harbor Supper Club over the Gull Lake Narrows to the Nisswa city line
- Lake Shore receives $2,528,591 to complete Gull Lake Trail — Pineandlakes Echo Journal (December 24, 2024) · web · checked Oct 14, 2026 Supports: Lake Shore's remaining segment less than a mile along CSAH 77 to the Nisswa city limits; $2,528,591 Legacy award; construction probably 2026; Nisswa's remaining 0.8 mile planned for 2025
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.