Gurnee Bike Path
Greenway in Illinois · OpenStreetMap relation
Runs through Gurnee · Lake County
Conditions now
Loading the weather near Gurnee…
Forecast by the National Weather Service for Gurnee · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Washington Street mile 0.9 directions to trailhead 1
- Parking at Washington Street mile 1 directions to trailhead 2
- Parking at North Milwaukee Avenue mile 1 directions to trailhead 3
- Parking at Washington Street mile 1.2 directions to trailhead 4
- Parking at Washington Street mile 1.8 directions to trailhead 5
- Parking at Gurnee Glen mile 2.3 directions to trailhead 6
- Parking at Washington Street mile 2.3 directions to trailhead 7
- Parking at North Hunt Club Road mile 2.3 directions to trailhead 8
- Parking at North Cemetery Road mile 3.2 directions to trailhead 9
- Parking at Dada Drive mile 3.7 directions to trailhead 10
- Parking at North Hunt Club Road mile 3.7 directions to trailhead 11
- Parking at Dada Drive mile 3.7 directions to trailhead 12
- Parking at Washington Street directions to trailhead 13
- Parking at North Almond Road directions to trailhead 14
- Parking at North Riverside Drive directions to trailhead 15
- Parking at North Dilleys Road directions to trailhead 16
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Gurnee Bike Path is a group of roadside bicycle paths in the Village of Gurnee, Lake County, Illinois, mapped in OpenStreetMap as a local bicycle route. Its main line follows Washington Street from about Almond Road east toward the Des Plaines River, with branch paths to the north; our record measures about 8.3 miles in all. The Washington Street path is part of a longer corridor that Lake County is completing between the Des Plaines River Trail and Round Lake.
In January 2026 the Lake County Board approved Lake County Division of Transportation work for that year on Washington Street between Mainsail Drive and Almond Road: a bike path on the south side from Mainsail Drive to U.S. 45 and on the north side from U.S. 45 to Almond Road, plus new sidewalks. Together with the Hunt Club Road intersection project at Washington Street, the county said, the work closes two gaps and creates a continuous 9.5-mile path from the Des Plaines River Trail to downtown Round Lake at Cedar Lake Road; once the Cedar Lake Road realignment is finished it will also connect to the Lake County Forest Preserves' Millennium Trail.
The Village of Gurnee reported in May 2026 that the south-side sidewalk was finished and drainage work for the north-side path had begun, with completion estimated for August 2026.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chicago Waukegan Regional Airport, 8.6 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 56 67 77 81 80 73 61 48 36 Low °F 16 18 27 36 46 56 62 61 54 43 31 22 Precipitation, in 1.4 1.5 2.2 3.8 3.9 4.5 3.5 3.6 3.6 3.2 2.3 1.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1906 Waukegan sheet (1:62,500); the 1960 Libertyville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesConstruction Projects — Village of Gurnee
- RedditSearch Reddit: r/illinois
Nearby trails
- Almont Road Bike Path within 0.2 mi · 1.5 mi, paved
- Des Plaines River Trail within 0.2 mi · 48.1 mi, gravel
- Millennium Trail 0.2 mi away · 29.6 mi, paved
- Grayslake Bike Paths 1.0 mi away · 7.6 mi, paved
- McDonald Woods Trail 2.5 mi away · 3.1 mi, crushed stone
- Prairie Crossing Bike Path 2.5 mi away · 5.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14214998, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Construction Projects — Village of Gurnee Engineering · government source · checked Oct 15, 2026 Supports: Washington Street Pedestrian Path Improvement (LCDOT): start March 2026, estimated completion August 2026; May 13, 2026 update on south-side sidewalk completion and north-side path drainage work
- County Board approves projects in Antioch, Gurnee — Shaw Local / Lake County Journal (Jan. 22, 2026) · web · checked Oct 15, 2026 Supports: January 2026 County Board approval; 2026 LCDOT construction of bike paths on Washington Street (south side Mainsail Dr to US 45, north side US 45 to Almond Rd) and sidewalks; with the Hunt Club Road at Washington Street project, closes two gaps for a continuous 9.5-mile path from the Des Plaines River Trail to downtown Round Lake at Cedar Lake Road; future connection to the Millennium Trail after the Cedar Lake Road realignment
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.