States › Indiana

Hanna Street Trail

Greenway in Indiana

Runs through Fort Wayne · Allen County

Conditions now

Loading the weather near Fort Wayne…

Forecast by the National Weather Service for Fort Wayne · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.4 mi 7.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Hanna Street mile 0.3 directions to trailhead 1
  2. Parking at South Hanna Street mile 0.4 directions to trailhead 2
  3. Parking at South Hanna Street mile 0.4 directions to trailhead 3
  4. Parking at South Hanna Street mile 0.4 directions to trailhead 4
  5. Parking at East Pontiac Street mile 3 directions to trailhead 5
  6. Parking at East Pontiac Street mile 3.1 directions to trailhead 6
  7. Parking at South Hanna Street mile 3.2 directions to trailhead 7
  8. Parking at East Creighton Avenue mile 3.3 directions to trailhead 8
  9. Parking at East Dewald Street mile 3.4 directions to trailhead 9
  10. Parking at Weisser Park Avenue mile 3.4 directions to trailhead 10
  11. Parking at Weisser Park Avenue mile 3.5 directions to trailhead 11
  12. Parking at East Berry Street mile 4.4 directions to trailhead 12
  13. Parking at East Wayne Street mile 4.4 directions to trailhead 13
  14. Parking at East Washington Boulevard mile 4.4 directions to trailhead 14
  15. Parking at East Wayne Street mile 4.4 directions to trailhead 15
  16. Parking at South Hanna Street mile 4.4 directions to trailhead 16
  17. Parking at East Washington Boulevard mile 4.4 directions to trailhead 17
Fort Wayne, along the trail (opens in a new tab)
Fort Wayne, along the trail · Photo: Momoneymoproblemz · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Hanna Street Trail is a 4.5-mile paved trail in Fort Wayne, Indiana, running along Hanna Street between downtown and Tillman Park and Southtown Centre on the city's southeast side. It is not a rail-trail. Planning began in 2013, when residents of southeast Fort Wayne formed the Urban Trails Project Committee and met with Fort Wayne Trails, Inc. and the City of Fort Wayne to ask for more trails in their area. The city built the trail in eight phases, with support from Fort Wayne Trails, a nonprofit that gave $100,000 toward the corridor in February 2024 as part of its Connecting 4 campaign and a further $157,000 toward the final segment. The city held a ribbon-cutting for the completed trail on May 28, 2026; WPTA reported the total investment at more than $5 million.

The final phase is 0.74 mile of 8-foot-wide concrete trail on the east side of Hanna Street from Wallace Street to East Berry Street; the city opened bids in June 2025. At its north end the trail meets the Berry Street sidewalk and bicycle lane, giving access to downtown and the Rivergreenway through a three-block sidewalk connection on Berry and Clay streets. At its south end it connects with the Rivergreenway and the 6-Mile Creek Trail. Parking is available at the James Redmond Trailhead, Tillman Park, Weisser Park and the Foellinger Foundation lot at the northeast corner of Clay and Berry streets.

According to the city, more than 23,000 residents live within half a mile of the trail. As of April 2026 the Greater Fort Wayne Area Trails Network had 165 miles of trails, 110 of them inside city limits, most planned, built and maintained by the City of Fort Wayne. The line on this page comes from OpenStreetMap and covers about 4.4 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Ft Wayne International Airport, 10.9 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333648617281848276644938
Low °F182129395060646153433324
Precipitation, in2.52.12.83.74.64.543.83332.5
Snow, in10.87.84.60.8000000.11.97.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Fort Wayne sheet (1:250,000); the 1956 Fort Wayne West sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Hanna Street Trail - Wallace Street to Berry Street — Engage Fort Wayne (City of Fort Wayne) · organization · checked Oct 15, 2026
    Supports: 4.5-mile length; connects Downtown Fort Wayne to Tillman Park and Southtown Centre; final phase 0.74 mile, 8-foot-wide concrete, east side of Hanna from Wallace to E. Berry; bids opened June 26, 2025; connection to Berry Street sidewalk and bicycle lane and the Rivergreenway; trail complete, ribbon-cutting May 28, 2026; 165 miles in the area network, 110 inside city limits, mostly built and maintained by the city (as of April 2026)
  3. Fort Wayne Trails Contributes Additional $157,000 to Hanna St Trail — Fort Wayne Trails · organization · checked Oct 15, 2026
    Supports: $157,000 toward the final segment from Wallace to Berry; earlier $100,000 gift in February 2024 as part of the Connecting 4 campaign; continuous connection from Tillman Park to downtown
  4. City of Fort Wayne celebrates completion of Hanna Street Trail with ribbon-cutting ceremony — 21Alive (WPTA), May 28, 2026 · press · checked Oct 15, 2026
    Supports: more than $5 million investment; connections to the Rivergreenway and 6-Mile Creek Trail on the south end and a three-block sidewalk connection on Berry and Clay streets on the north end; over 23,000 residents within a half mile; planning began in 2013 with the Urban Trails Project Committee; built in eight phases; parking at James Redmond Trailhead, Tillman Park, Weisser Park and the Foellinger Foundation lot
  5. OpenStreetMap ways for this trail · web · checked Oct 15, 2026
    Supports: mapped line of about 4.4 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.