States › Minnesota

Hardwood Creek Trail

Rail-trail in Minnesota · OpenStreetMap relation

Runs through Forest Lake and Hugo · Washington County

Conditions now

Loading the weather near Forest Lake…

Forecast by the National Weather Service for Forest Lake · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
10.6 mi 17.1 km1
On former railbed
9.9 mi 93%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Scandia Trail North mile 2.6 directions to trailhead 1
  2. Parking at Forest Boulevard North mile 8.7 directions to trailhead 2
  3. Parking at Flay Avenue North mile 9.1 directions to trailhead 3
  4. Parking at Forest Boulevard North mile 9.2 directions to trailhead 4
  5. Parking at Flay Avenue North mile 9.2 directions to trailhead 5
  6. Parking at Forest Boulevard North mile 9.2 directions to trailhead 6
  7. Parking at 148th Street North mile 9.2 directions to trailhead 7
  8. Parking at 147th Street North mile 9.3 directions to trailhead 8
  9. Parking at 147th Street North mile 9.3 directions to trailhead 9
  10. Parking at Forest Boulevard North mile 9.3 directions to trailhead 10
  11. Parking at 147th Street North mile 9.3 directions to trailhead 11
  12. Parking at 147th Street North mile 9.4 directions to trailhead 12
  13. Parking at Forest Boulevard North mile 9.5 directions to trailhead 13
  14. Parking at 146th Street North mile 9.5 directions to trailhead 14
  15. Parking at Forest Boulevard North mile 9.5 directions to trailhead 15
  16. Parking at Forest Boulevard North mile 9.6 directions to trailhead 16
  17. Parking at Forest Boulevard North mile 9.6 directions to trailhead 17
  18. Parking at Forest Boulevard North mile 9.6 directions to trailhead 18
  19. Parking at Forest Boulevard North mile 9.7 directions to trailhead 19
  20. Parking at 141st Street North mile 9.9 directions to trailhead 20
  21. Parking at 141st Street North mile 10 directions to trailhead 21
Hugo City Hall Sign (opens in a new tab)
Hugo City Hall Sign · Photo: Tburds · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Hardwood Creek Regional Trail is a paved multi-use rail-trail in northwestern Washington County, Minnesota, run by Washington County. Within the county it runs on 11 miles of former railroad right-of-way, a Burlington Northern Railroad corridor beside US 61, from the Washington–Chisago county line in Forest Lake south to 130th Street in Hugo. Its route was set in a master plan adopted in 2013.

At the county line the trail continues north as Chisago County's Sunrise Prairie Trail, 17 more miles to North Branch, and it also connects to the Central Anoka County Regional Trail to the west. Between Hugo and Forest Lake the corridor runs from residential areas into open fields. Parking is in Hugo between 145th and 146th streets and just off the trail at the Forest Lake YMCA, 19845 Forest Road North; an access point at US 61 and Broadway Avenue in Forest Lake, a little more than a mile south of the northern end, also has parking.

The corridor holds two parallel trails: the paved trail is open for bicycling, walking, running and in-line skating, while the grass trail beside it is for horses in summer and snowmobiles in winter. The paved trail was resurfaced in the spring of 2015 and is level and nearly straight. South of 130th Street the rail line is still active, leaving a one-mile gap to 120th Street that keeps the trail from reaching Ramsey County's parks and trails, including Bald Eagle–Otter Lakes Regional Park. Washington County plans to close the gap with a $1.24 million project from the state's Environment and Natural Resources Trust Fund, approved in June 2026, that schedules construction from May to October 2028. Once complete, it would link the trail to Ramsey County's Bruce Vento Regional Trail and form more than 40 miles of continuous trail between downtown Saint Paul and downtown North Branch.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 91% of this route as a trail on former railroad right-of-way.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Forest Lake 5ne, 13.4 km from the trail's middle, 15 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F243043587079838274604329
Low °F3619334556605850372411
Precipitation, in0.90.91.734.44.54.743.22.91.81.2
Snow, in9.69.39.23.7000000.67.411.8
Old maps

USGS topographic maps of the trail's middle go back to the 1948 Stillwater sheet (1:62,500); the 1954 Hugo sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6397583, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Hardwood Creek Regional Trail Extension, M.L. 2026 Approved Work Plan 2026-141 — Legislative-Citizen Commission on Minnesota Resources (Environment and Natural Resources Trust Fund) · government source · checked Oct 14, 2026
    Supports: Washington County trail in northwestern Washington County, 11 miles of former railroad right-of-way from the Washington/Chisago county line in Forest Lake to 130th St in Hugo, connections to Central Anoka County Regional Trail and Sunrise Prairie Regional Trail, one-mile gap 130th to 120th St because the rail line remains active, no connection to Ramsey County parks and trails or Bald Eagle - Otter Lakes Regional Park, 2013 master plan, $1,244,000 budget, work plan approved June 17, 2026, construction May to October 2028 (approximate), link to Bruce Vento Regional Trail and 40+ miles between downtown Saint Paul and downtown North Branch
  3. Hardwood Creek Regional Trail | Minnesota Trails | TrailLink · web · checked Oct 14, 2026
    Supports: former Burlington Northern Railroad corridor along US 61, two parallel trails (paved for biking, walking, running, in-line skating; grass for equestrian use in summer and snowmobiles in winter), resurfaced spring 2015, level and nearly straight, open fields, Sunrise Prairie Trail 17 miles to North Branch, parking in Hugo between 145th and 146th St and at Forest Lake YMCA (19845 Forest Rd N), access at US 61 and Broadway Avenue

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.