States › Nevada

Harry Reid Union Pacific Railroad Trail

Rail-trail in Nevada · OpenStreetMap relation

Runs through Henderson · Clark County

Conditions now

Loading the weather near Henderson…

Forecast by the National Weather Service for Henderson · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.5 mi 8.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Arroyo Grande Boulevard mile 2.7 directions to trailhead 1
  2. Parking at North Arroyo Grande Boulevard mile 2.9 directions to trailhead 2
  3. Parking at North Arroyo Grande Boulevard mile 3 directions to trailhead 3
  4. Parking at North Arroyo Grande Boulevard mile 3.1 directions to trailhead 4
  5. Parking at American Pacific Drive mile 3.2 directions to trailhead 5
  6. Parking at Fulgora Street mile 3.5 directions to trailhead 6
Harry Reid Union Pacific Railroad Trail (opens in a new tab)
Photo: hshearer · CC BY-SA 4.0 · Mapillary

About this trail

The Harry Reid Union Pacific Railroad Trail, also called the Harry Reid UPRR Trail, is a paved rail-with-trail in Henderson, Nevada, running beside an active Union Pacific spur. The record here covers about 5.5 miles. The City of Henderson, through news coverage of its 2022 opening, describes the full trail as 12 miles long, while TrailLink lists a longer figure.

According to FOX5, work on a 4.5-mile expansion began in April 2020, and the city held a ribbon-cutting at Acacia Park on March 19, 2022, calling the expansion the final component of the 12-mile trail. The expansion runs from Acacia Park to St. Rose Parkway, with added pedestrian access at Wigwam Parkway, Stephanie Street, Arroyo Grande Boulevard, Valle Verde Drive and Green Valley Parkway, and the project included pedestrian tunnels and bridges.

TrailLink says the spur sees infrequent freight traffic, a fence separates the trail from the rail line, and the northern end is at Green Valley Park (370 North Pecos Road). It passes Acacia Park, crosses I-215 where it meets the I-215 East Beltway Trail, meets the Pittman Wash Trail at the Arroyo Grande Sports Complex, and ends at the River Mountains Loop Trail near Railroad Pass.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Las Vegas Mccarran Airport, 10.2 km from the trail's middle, 78 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F58637178889910410395816757
Low °F404450576676828172604740
Precipitation, in0.60.80.40.20.100.40.30.30.30.30.5
Snow, in000000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Las Vegas sheet (1:250,000); the 1967 Las Vegas SE sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 13671565, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Henderson to open Harry Reid UPRR bike trail Saturday — FOX5 Las Vegas · web · checked Oct 17, 2026
    Supports: 2020 start, 2022 opening, 4.5-mile expansion, 12-mile trail, access points, tunnels and bridges
  3. Harry Reid Union Pacific Railroad Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 17, 2026
    Supports: active spur, fence, northern end, connections, parking, River Mountains Loop Trail
  4. OpenStreetMap relation 13671565 — OpenStreetMap · web · checked Oct 17, 2026
    Supports: name and length of this record

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.