States › Michigan

Haywire Grade ORV Trail

Rail-trail in Michigan

Runs through Munising Township, Inwood Township, Thompson Township and Hiawatha Township · Alger and Schoolcraft counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Michigan DNR Parks and Recreation Division.2

Length
31.3 mi 50.4 km1
Surface
Dirt12
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Plan your visit

  • Official pageHaywire Grade Trail Michigan DNR · could not be checked automatically (the site refuses scripts)

Links checked Oct 18, 2026, except those marked. Sources: Michigan DNR.

Haywire Grade ORV Trail drawn on the 1958 USGS topographic map of Marquette, Michigan
Then: the 1958 USGS Marquette sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Haywire Grade is a multi-use rail-trail in Michigan's central Upper Peninsula, running about 32 miles between Manistique in Schoolcraft County and Shingleton in Alger County. The Michigan Department of Natural Resources counts it as the state's first rail-trail. It follows the former Manistique and Lake Superior Railroad, which began operating in 1898 as the Manistique and Northwestern and took its later name in 1909. The line served the logging industry, and much of the timber cut along it went to Illinois to rebuild Chicago after the Great Fire. The railroad ceased operation in 1968; Schoolcraft and Alger counties, the Hannah Mining Company, the U.S. Forest Service and the DNR acquired the land, and the trail opened in 1970, first planned for seasonal snowmobile use.

The southern end is at Intake Park on Riverview Drive in Manistique. From there, mile markers installed in 2017 stand on the east side of the trail every mile to Shingleton, each carrying the railroad's logo. Jack Pine Lodge lies about 15 miles up the trail from Manistique. A sign marks the northern end on the east side of M-94 just south of Shingleton; there is no parking there, and TrailLink lists spaces east of the Tanglewood Restaurant on M-28, under a quarter mile north. For the trail's 50th anniversary in 2020, partners including the DNR, Hiawatha National Forest, the city of Manistique and the Schoolcraft County Motorized Trail Association added 11 interpretive kiosks built from Upper Peninsula rail steel and local cedar, and the route was named a Pure Michigan Trail.

The trail is shared by snowmobiles, off-road vehicles, horses, bicycles and walkers, and it is one of the Upper Peninsula's main north-south snowmobile corridors. TrailLink describes a surface of gravel, dirt and sand, with old rail ballast that makes travel difficult for bikes and horses in places, and riders' reviews there report deep sand near the Intake Park end.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

41% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Garden Corners, 32 km from the trail's middle, 36 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F262836486272787769554131
Low °F8713284050545044352716
Precipitation, in1.81.51.93.13.23.43.53.23.73.532.3
Old maps

USGS topographic maps of the trail's middle go back to the 1931 Steuben NW sheet (1:31,680); the 1958 Steuben sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “managing_org from Michigan DNR Statewide Railtrails”
  3. Showcasing the DNR: Haywire for a half century — Michigan Department of Natural Resources (bulletin, March 26, 2020) · web · checked Oct 14, 2026
    Supports: multi-use trail from Shingleton to Manistique; first rail-trail in Michigan, in Schoolcraft and Alger counties; established 1970, two years after the Manistique and Lake Superior ceased operation; 32 miles; first planned for seasonal snowmobile use; Manistique and Northwestern 1898, reorganized 1909; logging and timber sent to Illinois after the Great Chicago Fire; 11 interpretive kiosks of Upper Peninsula rail steel and cedar; anniversary partners; snowmobile ride of about 15 miles from Manistique to Jack Pine Lodge; equine, bicycle and ATV/ORV anniversary events; Pure Michigan Trail designation
  4. Michigan's first rail trail boasts innovative mile markers — Michigan Department of Natural Resources (bulletin, November 14, 2017) · web · checked Oct 14, 2026
    Supports: mile markers every mile from Intake Park to Shingleton on the east side, with mile number and Manistique and Lake Superior logo, above average snow depth; line abandoned 1968; land acquisition partners (Schoolcraft and Alger counties, Hannah Mining Company, U.S. Forest Service, DNR); trail debuted 1970
  5. Haywire Grade will turn 50 in 2020 — WLUC TV6 (Upper Michigan's Source) · web · checked Oct 14, 2026
    Supports: one of the main north-south snowmobile corridors in the Upper Peninsula
  6. Haywire Grade Trail | Michigan Trails | TrailLink · web · checked Oct 14, 2026
    Supports: end points at Intake Park, Riverview Drive (Manistique) and Route 94 (Shingleton); northern trailhead sign on the east side of M-94 south of Shingleton, no parking, spaces east of the Tanglewood Restaurant on M-28; surface of gravel, dirt and sand with ballast difficult for bikes and horses; ATV, snowmobile, mountain biking, hiking and horse use; reviews reporting deep sand at the Intake Park entrance

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.