Heart of the Lakes Trail

Greenway in Minnesota · OpenStreetMap relation

Runs through Pelican Township (Otter Tail County), Pelican Rapids, Erhards Grove Township, Maplewood Township, Lida Township, Dora Township, Edna Township, Perham and 1 more · Otter Tail County

All 9 towns and places

Pelican Township (Otter Tail County), Pelican Rapids, Erhards Grove Township, Maplewood Township, Lida Township, Dora Township, Edna Township, Perham Township and Perham

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
31.6 mi 50.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at County Road 34 mile 1.5 directions to trailhead 1
  2. Parking at Paul M Osborn Road mile 11.2 directions to trailhead 2
  3. Parking at County Highway 41 mile 15.9 · restrooms directions to trailhead 3
  4. Parking at Cross Point Lane mile 22.1 · restrooms directions to trailhead 4
  5. Parking mile 31.6 directions to trailhead 5
Heart of the Lakes Trail (opens in a new tab)
Photo: milk_man · CC BY-SA 4.0 · Mapillary

About this trail

The Heart of the Lakes Trail is a paved multi-use trail of about 31 miles in Otter Tail County, Minnesota, linking Pelican Rapids and Perham through Maplewood State Park. Otter Tail County built and runs it. Planning began with a 2014 corridor study and construction in 2020; the Perham segment opened in 2021 and the Pelican Rapids, Silent Lakes and McDonald Lakes segments in 2022 and 2023. The last piece, through Maplewood State Park, opened with a ribbon cutting in August 2025. The work was funded largely by grants recommended by the Legislative-Citizen Commission on Minnesota Resources and the Greater Minnesota Regional Parks and Trails Commission, and the project won the Minnesota County Engineers Association's 2025 Special Project of the Year award.

The trail has five segments. From a trailhead at the Pelican Rapids school football field, with restrooms and a bike repair station, the 7-mile Pelican Rapids segment runs beside County State Aid Highway 3 to the state park. The 3.8-mile Maplewood segment, 10 feet wide, winds through the park's woods, prairies and wetlands to a point north of Highway 108. The 8.1-mile Silent Lake segment crosses Lida and Dora townships to County Road 41, and the 5.8-mile McDonald Lake segment follows County Road 35 along the north side of the McDonald chain of lakes. The 6.2-mile Perham segment follows County Road 34 into Perham; its Memorial Trailhead at 410th Avenue has a water fountain and bike repair station.

The trail is separated from vehicle traffic along its whole length and is open year-round. Motor vehicles are barred in spring, summer and fall, but snowmobiles are allowed on some segments in winter. Bicycles are allowed on the paved trail only; electric bicycles are permitted below 20 mph. Pets must be leashed, and overnight parking at trailheads is not allowed.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Detroit Lakes 1 NNE, 29.7 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F172336526676797870533722
Low °F-401529425358554634196
Precipitation, in0.80.7123.74.94.33.33.52.81.41
Snow, in8.39.47.75.3000001.14.811
Old maps

USGS topographic maps of the trail's middle go back to the 1912 Vergas sheet (1:62,500); the 1953 Brainerd sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18494574, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Heart of the Lakes Trail — Otter Tail County, MN · government source · checked Oct 14, 2026
    Supports: connects Perham, Pelican Rapids and Maplewood State Park, five segments with lengths, routes and trailheads, Pelican Rapids trailhead amenities, Memorial Trailhead amenities, winter snowmobiling on some segments, motor vehicles barred other seasons, rules (bikes on paved trail only, e-bikes under 20 mph, leashed pets, no overnight parking), open year-round
  4. Heart of the Lakes Regional Trail completed with opening of Maplewood State Park segment — Otter Tail County, MN · government source · checked Oct 14, 2026
    Supports: 2014 master plan, Perham segment 2021, other segments 2022–2023, Maplewood segment 3.8 miles, 10 feet wide, through forests, prairies and wetlands, ribbon cutting posted August 6, 2025, LCCMR funding
  5. County earns State award for Heart of the Lakes Trail — Otter Tail County, MN · government source · checked Oct 14, 2026
    Supports: 2014 corridor study, construction began 2020 over five seasons, fully separated from vehicle traffic, LCCMR and GMRPTC grants, 2025 MCEA Special Project of the Year award

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.