Highway 87 Bikeway
Greenway in California · OpenStreetMap relation
Runs through San Jose · Santa Clara County
Conditions now
Loading the weather near San Jose…
Forecast by the National Weather Service for San Jose · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Goodyear Street mile 0.1 directions to trailhead 1
- Parking at Lick Avenue mile 0.3 directions to trailhead 2
- Curtner mile 1.9 directions to Curtner
- Curtner mile 1.9 directions to Curtner
- Parking at Canoas Garden Avenue mile 1.9 directions to trailhead 5
- Curtner mile 2 directions to Curtner
- Parking at Bus Ring mile 2.9 · restrooms directions to trailhead 7
- Capitol mile 3.3 directions to Capitol
- Capitol mile 3.5 directions to Capitol
- Branham mile 3.9 directions to Branham
- Ohlone/Chynoweth mile 4.6 directions to Ohlone/Chynoweth
Plan your visit
- By trainAmtrak: San Jose, CA (SJC) 1.3 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Highway 87 Bikeway, also called the SR 87 Bikeway, is a pedestrian and bicycle path in San Jose, California, that runs beside State Route 87, the Guadalupe Freeway. Caltrans built it as part of the final phase of the SR 87 freeway project, and it opened to the public on September 1, 1993. The freeway's southern segment opened from Interstate 280 to Almaden Expressway in 1992 and on to State Route 85, alongside a light rail line, in August 1993.
The full route is 4.1 miles long, from Willow Street, north of the Alma Street exit, south to the interchange of SR 87 and SR 85, and it runs along the east side of the freeway. It leaves the freeway twice to use city streets: for 1.1 miles near Capitol Expressway and for 0.7 miles near Curtner Avenue. The path connects the two segments of the Guadalupe River Trail and links with the Three Creeks Trail and the Los Gatos Creek Trail, as well as four light rail stops: Tamien, Curtner, Capitol and Branham.
This record maps about 2.9 miles of off-street path in three pieces, from near Goodyear Street and Lick Avenue in the north to the Ohlone/Chynoweth light rail area in the south, with two breaks in the line. OpenStreetMap shows the path as paved and marks access points at Goodyear Street, Lick Avenue, Branham and Ohlone/Chynoweth.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
San Jose, 7.6 km from the trail's middle, 35 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 59 63 66 70 75 80 82 83 81 75 65 59 Low °F 43 45 48 50 53 57 59 60 58 54 47 43 Precipitation, in 3 3.2 2.6 1.2 0.5 0.2 0 0 0.1 0.8 1.4 3.1 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 San Jose sheet (1:62,500); the 1953 San Jose East sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Oct 2026
- Bike path on 87 (south of Tamien station) - unleashed dogs are back r/SanJose · Oct 2026 · 5 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Nearby trails
- Guadalupe River Trail 0.3 mi away · 15.3 mi, paved
- Communications Hill Trail 0.3 mi away · 1.9 mi, paved
- Three Creeks Trail 0.3 mi away · 1.0 mi, paved
- Los Gatos Creek Trail 0.8 mi away · 12.6 mi, paved
- Los Alamitos Creek Trail 1.2 mi away · 5.5 mi, paved
- Guadalupe Creek Trail 1.2 mi away · 1.9 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 53029, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- California State Route 87 — Wikipedia · organization · checked Oct 16, 2026 Supports: SR 87 Bikeway: 4.1-mile pedestrian and bicycle path; built by Caltrans in the final phase of the SR 87 project; opened September 1, 1993; east side of the freeway; Willow Street north of the Alma Street exit to the 87-85 interchange; on-street detours of 1.1 miles near Capitol Expressway and 0.7 miles near Curtner Avenue; connects the two segments of the Guadalupe River Trail; links to Three Creeks Trail, Los Gatos Creek Trail and light rail stops Tamien, Curtner, Capitol and Branham; southern freeway segment opened 1992 and August 1993 alongside light rail
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: record length about 2.9 miles in three pieces; paved surface; access points at Goodyear Street, Lick Avenue, Branham and Ohlone/Chynoweth
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.