Highway 9 Trail
Greenway in Oklahoma
Runs through Norman · Cleveland County
Conditions now
Loading the weather near Norman…
Forecast by the National Weather Service for Norman · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Postal Training Center Drive mile 1.6 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Highway 9 Trail is a paved multi-use path of about 1.9 miles (3.1 km) in east Norman, Oklahoma, along State Highway 9 East. The City of Norman calls the broader project the Multimodal Path, a pathway for walking and bicycling that is meant to connect urban Norman to Lake Thunderbird along the highway.
According to the city, the project is built in phases, the first of which began in 2019. In April 2023 the Oklahoma Department of Transportation Commission approved $2,117,966.67 in federal Transportation Alternative Program funds for a phase from 48th Avenue East to 72nd Avenue SE, with construction tentatively set for winter 2024-25 and completion as early as summer 2025. The Norman Transcript reported that the path runs on the north side of the highway and that the grants cover 48th to 60th Avenue and 60th to 72nd Avenue, about two miles. The city's public works director said that once complete it would give pedestrians and bicyclists their first way to travel along SH 9 East from urban Norman outside vehicular traffic.
OpenStreetMap maps the paved portion that carries this name at about 1.9 miles. The sources do not say how much of the funded extension has been built, or whether the mapped stretch lies in earlier or later phases.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Norman 3sse, 4.6 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 50 54 63 71 79 87 92 92 84 74 62 52 Low °F 28 31 40 48 58 67 71 70 62 50 39 31 Precipitation, in 1.4 1.6 2.8 3.5 5.1 4.8 3.7 3.6 3.7 3.4 2 2 Snow, in 1.2 1.2 0.2 0 0 0 0 0 0 0 0.5 1 - Old maps
USGS topographic maps of the trail's middle go back to the 1893 Norman sheet (1:62,500); the 1965 Norman sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City receives more than $2 million in federal funds to continue Multimodal Path Project in Norman — City of Norman, OK · government source · checked Oct 18, 2026 Supports: phases since 2019, $2,117,966.67 TAP grant, 48th Avenue East to 72nd Avenue SE, schedule, link from urban Norman to Lake Thunderbird along SH 9 East
- Norman to extend multimodal path closer to Lake Thunderbird — Norman Transcript (via Yahoo News) · web · checked Oct 18, 2026 Supports: path on the north side of SH 9, two-mile extension, two grants 48th-60th and 60th-72nd
- OpenStreetMap ways for this trail · web · checked Oct 18, 2026 Supports: trail name, length, surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.