Historic Gilpin Tramway
Rail-trail in Colorado
Runs through Black Hawk · Gilpin County
Conditions now
Loading the weather near Black Hawk…
Forecast by the National Weather Service for Black Hawk · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Hidden Treasure Trailhead mile 0 · restrooms directions to Hidden Treasure Trailhead
- Hidden Treasure Trailhead mile 0 · restrooms directions to Hidden Treasure Trailhead
About this trail
The Historic Gilpin Tramway is a gravel path of about 1.5 miles (2.4 km) near Black Hawk, Gilpin County, Colorado, on the southern edge of the Maryland Mountain trail system. The City of Black Hawk acquired the 600-acre Maryland Mountain Quartz Valley property just north of town, and the Boulder Mountain Bike Alliance reports that the city built about 12 miles (19 km) of trail there; OpenStreetMap lists the city as operator of the path. The alliance describes the Tramway as a graded, compacted surface about 48 inches (1.2 m) wide with grades generally under 4 percent, and gives the route as 2.7 miles (4.3 km).
OpenStreetMap tags the path as an abandoned railway of 610 mm gauge, the two-foot gauge that Wikipedia gives for the Gilpin Railroad; the Wikipedia article does not mention the trail. That narrow-gauge line carried ore from the mines above Black Hawk to the mills: grading began in May 1887, the first rails were laid on July 1, 1887, and the last train ran on January 17, 1917; the railroad was sold for scrap that June. OpenStreetMap tags the path for bicycles and foot traffic, with dogs on leash, and not for horses.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June to August. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Georgetown, 20.2 km from the trail's middle, 47 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 38 44 50 60 72 77 74 68 57 44 36 Low °F 16 15 21 26 35 42 49 46 39 30 22 15 Precipitation, in 0.8 0.9 1.4 2.3 2.1 1.5 2.5 2.2 1.5 1.2 0.9 0.9 Snow, in 12.5 12.6 18.5 20.9 6.6 0.2 0 0 1.6 7.5 11.1 14.4 - On the National Register
- Central City--Black Hawk Historic District, Central City · historic district, listed 1966 · nomination file for Central City--Black Hawk Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1905 Central City sheet (1:62,500); the 1942 Central City sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Greenway Trail 4.1 mi away · 1.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Maryland Mountain Grand Opening — Boulder Mountainbike Alliance · organization · checked Oct 31, 2026 Supports: page dated May 21, 2021; City of Black Hawk acquired the 600-acre property just north of town to create Maryland Mountain Quartz Valley Park; the city built approximately 12 miles of trail; Historic Gilpin Tramway graded surface is the southern perimeter of the trail system; surface approximately 48 inches wide, grades generally under 4 percent, compacted surface; the 2.7 mile route
- Gilpin Railroad — Wikipedia · organization · checked Oct 31, 2026 Supports: 2 ft (610 mm) narrow gauge railway in Gilpin County; built to transport ore from the mines above Black Hawk to the mills; grading started May 1887; first rails laid July 1, 1887; operated 1887 to 1917; last train January 17, 1917; sold for scrap June 1917; no mention of a trail
- Historic Gilpin Tramway, way 946894686 — OpenStreetMap · web · checked Oct 31, 2026 Supports: a way named Historic Gilpin Tramway tagged highway=path, railway=abandoned, gauge=610, surface=gravel, width=3, bicycle=designated, foot=designated, horse=no, dog=leashed, operator=City of Black Hawk, network=Maryland Mountain
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.