Historic Marble Rail Trail
Rail-trail in Vermont
Runs through Town of Manchester and Manchester Center · Bennington County
Conditions now
Loading the weather near Manchester Center…
Forecast by the National Weather Service for Manchester Center · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Road mile 1.9 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Historic Marble Rail Trail is a crushed-stone path in Manchester, Vermont, on the bed of the Manchester, Dorset and Granville Railroad. Bike Manchester VT, a town committee that promotes walking and cycling, describes it as running from downtown Manchester Center to North Road, 5.5 miles round trip; about 1.9 miles are mapped here.
The railroad was incorporated in 1902 by the Norcross-West Marble Company, which held a contract to supply marble for the New York Public Library, and was completed in 1903 from the Rutland Railroad near Manchester's depot north to a quarry in southern Dorset; it never reached Dorset village or Granville, New York. It carried marble to a finishing plant in Manchester, and passengers. Regular traffic ended in 1918 and the rails were removed in 1934. Old Railroad Bed LLC, formed by local residents, bought the last remaining section of the bed in 2009 and built the trail. The town later committed $120,000 for the purchase and $50,000 for improvements, and Bike Manchester VT raised $80,000. The Manchester Historical Society reports that the town took ownership after a ribbon-cutting in January 2023.
The section the owners built is about 5,500 feet long, mostly level and 10 to 11 feet wide, surfaced with Sure-Pack, a mix of stone, sand and stone dust. It has two bridges over small streams, interpretive signs on the railroad's history and a picnic table with views of Mount Aeolus, where the quarries were. To the south it connects with a trail through the town recreation park to Manchester Elementary Middle School. Access points are the school on Memorial Avenue, Dana L. Thompson Memorial Park, Riley Rink at Hunter Park and a lot on North Road across from Squires Road. An extension north to the Dorset School has been proposed.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sunderland 2, 13 km from the trail's middle, 31 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 35 43 57 69 77 81 79 73 60 48 37 Low °F 11 12 20 31 42 51 55 54 46 36 28 19 Precipitation, in 3.5 2.8 3.4 3.5 4.1 4.8 4.6 4.3 3.7 4.5 3.3 4.4 Snow, in 18.5 16.4 14 4.1 0 0 0 0 0 0.7 4.1 17.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1894 Equinox sheet (1:62,500); the 1968 Manchester sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBike Manchester VT
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Manchester, Dorset and Granville Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: 1902 incorporation by Norcross-West Marble Company; New York Public Library contract; 1903 completion, route and termini; marble and passengers; 1918 end of regular traffic; 1934 rail removal
- From MD&G Railroad to Historic Rail Trail — Manchester Historical Society · organization · checked Oct 13, 2026 Supports: 2009 purchase by Old Railroad Bed, LLC; town ownership after the January 2023 ribbon-cutting
- A Vermont Rail-Trail Leads to the New York Public Library — Rails-to-Trails Conservancy (2020) · organization · checked Oct 13, 2026 Supports: Old Railroad Bed LLC formed by local residents; 5,500 feet; Sure-Pack surface; mostly level; two bridges; interpretive signs; picnic table and Mount Aeolus views; connection south to the recreation park and Manchester Elementary Middle School; proposed extension to the Dorset school
- '23 Brings New Hope for Rail Trail — Manchester Journal (January 3, 2023) · press · checked Oct 13, 2026 Supports: trail name; town commitment of $120,000 and $50,000; Bike Manchester VT as a town committee raising $80,000; ends at North Road; proposed extension to the Dorset School
- Manchester Select Board Moves Forward on Rail Trail — Bennington Banner (January 20, 2021) · press · checked Oct 13, 2026 Supports: 10 to 11 feet wide
- Bike Paths — Bike Manchester VT · web · checked Oct 13, 2026 Supports: Downtown Manchester Center to North Road; 5.5 miles round trip; access points
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.