Historic Orchard Pathway
Greenway in Utah
Runs through Brigham City and Perry · Box Elder County
Conditions now
Loading the weather near Perry…
Forecast by the National Weather Service for Perry · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West 3000 South mile 1.1 · restrooms directions to trailhead 1
- Parking at Perry Street mile 1.1 directions to trailhead 2
- Parking at Perry Street mile 1.5 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Historic Orchard Pathway is a paved shared path in Box Elder County, Utah, between Perry and Brigham City. Council records of Willard, Brigham City and Perry name it: Willard's city planner said in December 2023 that it will go through The Orchards development, and Perry's December 2025 agenda packet lists a "1200 W Central Trail (Historic Orchard Pathway) Drainage" project. A May 2026 Ground News summary of a Box Elder News Journal report says Willard City Council approved an interlocal agreement on May 7 tied to a proposed five-mile (8.0 km) shared-use trail along the UTA-owned corridor south from Willard. The mapped line covers about 2.4 miles (3.9 km), mapped in OpenStreetMap as asphalt and concrete.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Brigham City Waste Plt, 7.2 km from the trail's middle, 26 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 42 54 62 71 82 91 89 79 65 50 38 Low °F 18 22 31 36 44 50 58 56 46 36 27 20 Precipitation, in 1.5 1.2 1.5 1.7 2 1.1 0.4 0.6 1.3 1.6 1.1 1.4 Snow, in 12.2 7.5 4.2 1.2 0 0 0 0 0 0.5 4.1 8.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Brigham City sheet (1:250,000); the 1955 Willard sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Bird Refuge Trail 0.6 mi away · 2.4 mi, paved
- Canal Road 0.6 mi away · 14.1 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Willard City Council Meeting minutes, December 14, 2023 — Utah Public Notice Website · government source · checked Oct 31, 2026 Supports: Willard city planner Bryce Wheelwright said the Historic Orchard Pathway trail will go right through The Orchards property (minutes of the December 14, 2023 council meeting)
- Regular Session of the Brigham City Council, May 2, 2024 — Utah Public Notice Website · government source · checked Oct 31, 2026 Supports: Historic Orchard Pathway would go to the north instead of along the frontage road in the 1100 South 1100 West planned district; the Historic Orchard Pathway trail was not needed along the frontage road (May 2, 2024 council meeting)
- Perry City Council Meeting Amended Agenda, December 11, 2025 — Utah Public Notice Website · government source · checked Oct 31, 2026 Supports: project listed as 1200 W Central Trail (Historic Orchard Pathway) Drainage in the agenda packet for the December 11, 2025 council meeting
- Willard City, Box Elder County county approve Historic Orchard Pathway trail agreement (summary of Box Elder News Journal report, May 2026) — Ground News · press · checked Oct 31, 2026 Supports: Willard City Council approved an interlocal agreement May 7; proposed five-mile shared-use pedestrian and bicycle trail along the UTA-owned Historic Orchard Pathway corridor; agreement among Willard City, Box Elder County and UDOT; path would extend south from Willard City
- Historic Orchard Pathway — OpenStreetMap way 1328293754 · web · checked Oct 31, 2026 Supports: highway=cycleway, bicycle=designated, foot=designated, surface=asphalt, alt_name Willard Bamburger Trail; other ways of the line surface=concrete; ways tagged highway=proposed are not part of the mapped line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.