Hoblitzelle Park Trail
Greenway in Texas
Runs through Plano · Collin County
Conditions now
Loading the weather near Plano…
Forecast by the National Weather Service for Plano · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Red River Drive mile 0.8 directions to trailhead 1
- Parking at Red River Drive mile 0.8 directions to trailhead 2
(opens in a new tab) About this trail
The Hoblitzelle Park Trail is a concrete shared-use trail in Hoblitzelle Park in north Plano, Texas, part of the City of Plano trail system managed by the Plano Parks and Recreation Department. It runs along Russell Creek, and the city describes more than 3 miles of pathway; TrailLink counts 3.6 miles of loops and spurs between Hoblitzelle Park and Enfield Park, with connections to Hendrick Middle School and Hedgcoxe Elementary School. This record maps about 4.0 miles. It is a creek greenway, not a rail-trail.
The park has a picnic pavilion, three playgrounds and restrooms, and parking is available in the park; the record shows parking off Red River Drive. Students use the trail to walk to school.
In 2022 the city replaced about 1 mile of the trail near Red River Drive that was in poor condition, building a 12-foot-wide shared-use path designed to meet accessibility standards and to carry stormwater into Russell Creek, with repairs to erosion damage and channel stabilization. The project, paid for through the city's Community Investment Program, was estimated at $1,283,000 and registered for construction from February to December 2022; the parks department planted 15 trees to offset trees removed for the work. A later project in the east part of the park, registered for June 2024 to September 2025, added a new sidewalk, trail and playground.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Richardson, 9.5 km from the trail's middle, 16 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 60 69 75 83 90 94 95 87 78 66 57 Low °F 36 40 48 55 64 71 75 74 67 56 46 38 Precipitation, in 2.8 3.4 3.6 3.5 5.2 3.8 2.2 2.5 3.3 5.3 3 3.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1929 McKinney sheet (1:62,500); the 1960 Plano sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Bluebonnet Trail 0.6 mi away · 11.0 mi, paved
- Rowlett Creek Trail 0.7 mi away · 5.5 mi, paved
- Watters Trail 1.3 mi away · 6.6 mi, paved
- Chisholm Trail 1.4 mi away · 7.6 mi, paved
- Oak Point Park & Nature Preserve 2.1 mi away · 5.2 mi, paved
- Preston Ridge Trail 2.5 mi away · 12.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Hoblitzelle Trail Replacement at Red River, TABS2022003144 — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: 7500 Red River Drive; February-December 2022; $1,283,000; reconstruct trail to 12-foot width to accessibility standards; erosion repair and channel stabilization
- Hoblitzelle Park East Renovation, TABS2023026311 — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: new sidewalk, trail and playground in the park, June 2024 to September 2025
- Section of trail at Hoblitzelle Park in Plano to be replaced with new, wider pathways — Community Impact (April 26, 2022) · web · checked Oct 15, 2026 Supports: Plano Parks and Recreation release; about 1 mile replaced with a 12-foot shared-use path; stormwater into Russell Creek; Community Investment Program funding; trail along Russell Creek with more than 3 miles of pathway per the city; pavilion, three playgrounds, restrooms; students walk the trail to school; 15 trees planted
- Hoblitzelle Park Trail — TrailLink · web · checked Oct 15, 2026 Supports: part of the City of Plano trails system; 3.6 miles of loops and spurs; end points Hoblitzelle Park and Enfield Park; concrete; connections to Hendrick Middle School and Hedgcoxe Elementary School; parking at Hoblitzelle Park
- OpenStreetMap ways for this trail · web · checked Oct 15, 2026 Supports: mapped length; parking off Red River Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.