States › Arizona

Houghton Bicycle Path

Greenway in Arizona

Runs through Tucson · Pima County

Conditions now

Loading the weather near Tucson…

Forecast by the National Weather Service for Tucson · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Houghton Road mile 2.9 directions to trailhead 1
  2. Parking at South Houghton Road mile 3.1 directions to trailhead 2
Houghton Bicycle Path drawn on the 1957 USGS topographic map of Tucson, Arizona
Then: the 1957 USGS Tucson sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Houghton Bicycle Path is a paved path of about 3.1 miles along South Houghton Road in Pima County, Arizona. The name comes from OpenStreetMap, which records the path as paved, and no manager page uses that name.

Pima County describes related work on the same road. A South Houghton Road widening project, listed as completed in December 2023, widened about 3 miles of the road from the Interstate 10 interchange south to Andrada Polytechnic and Pantano High Schools and included a separated multi-use path that connects to The Loop, the county's network of about 140 miles of paved shared-use paths and short buffered bike-lane segments. A separate South Houghton Multi Use Path Project is in design for a 10-foot-wide path along the east side of the road in two segments, from Camino del Toro to Forrest Feezor Street and from Vista Monte Drive to Sahuarita Road, 0.68 miles in all. The county's page says it would join the existing multi-use path between Forrest Feezor Street and Vista Monte Drive. That project's page lists construction beginning in winter 2026 and finishing in winter 2027.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Green Valley, 26.6 km from the trail's middle, 52 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F6769768291100999794867666
Low °F363944505868727166544336
Precipitation, in0.80.90.60.30.20.42.92.71.70.80.51.1
Snow, in000.1000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1904 Tucson sheet (1:125,000); the 1968 Tucson SE sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. South Houghton Multi Use Path Project — Pima County, AZ · government source · checked Oct 17, 2026
    Supports: 10-foot path, limits, 0.68 miles, existing path, schedule
  3. South Houghton Road Widening Project — Pima County, AZ · government source · checked Oct 17, 2026
    Supports: widening limits, completion December 2023, separated multi-use path connecting to The Loop
  4. The Chuck Huckelberry Loop — Pima County, AZ · government source · checked Oct 17, 2026
    Supports: about 140 miles, paved shared-use paths and buffered bike lanes
  5. OpenStreetMap ways for this trail · web · checked Oct 17, 2026
    Supports: path name, paved surface, geometry and length

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.