States › Massachusetts

Housatonic Rail Trail

Rail-trail in Massachusetts

Runs through West Stockbridge, Great Barrington and Housatonic · Berkshire County

Conditions now

Loading the weather near Housatonic…

Forecast by the National Weather Service for Housatonic · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.3 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Housatonic Rail Trail, Housatonic MA (opens in a new tab)
Housatonic Rail Trail, Housatonic MA · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Housatonic Rail Trail is a crushed-stone trail on an old railroad bed in the village of Housatonic, in Great Barrington, Massachusetts. Berkshires Outside lists it as managed by the Town of Great Barrington, and iBerkshires described the stretch south of Main Street in October 2023 as the town-owned section of the trail. OpenStreetMap maps the line on an abandoned railway.

Berkshires Outside gives the official section as three-quarters of a mile, from Main Street in Housatonic to the trail's end at a solar farm off Van Deusenville Road, with about 2.5 miles of narrower trail continuing north of Main Street into West Stockbridge, reaching Route 41 and Pixley Hill Road. The mapped line covers about 1.4 miles (2.25 km). Parking is at the southern terminus, in a gravel lot with room for at least ten cars, and behind Saint Bridget's Cemetery, about half a mile north, with room for at least five.

The official section is compact crushed stone, at least 5 feet wide, with grades under 5 percent; the northern section is compact dirt and gravel, at least 3 feet wide, with some grades between 5 and 10 percent. In October 2023 the town closed about 3,100 feet south of Main Street for four to five weeks of improvements, funded with Community Preservation Act and DPW funds, to improve conditions for accessibility, bikes, strollers and pedestrians. OpenStreetMap tags the ways as cycleways with bicycles designated and a fine-gravel surface.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

72% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Copake, 21.4 km from the trail's middle, 65 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343745597078838173605039
Low °F141523344555605951403021
Precipitation, in3.12.33.33.24.64.33.83.84.54.22.93.4
Snow, in15.510101.80000001.810.5
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Pittsfield sheet (1:62,500); the 1959 Stockbridge sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Housatonic Rail Trail in Great Barrington, MA — Berkshires Outside · organization · checked Oct 31, 2026
    Supports: managed by the Town of Great Barrington; old railroad bed in Great Barrington; official section three-quarters of a mile from Main Street in Housatonic to a solar farm off Van Deusenville Road; about 2.5 miles of narrower trail north of Main Street into West Stockbridge; northern terminus at Route 41 and access at Route 41 and Pixley Hill Road; surface, width and grade of each section; parking at the southern terminus (gravel lot, at least ten cars) and behind Saint Bridget's Cemetery about half a mile north (at least five cars)
  3. Great Barrington Begins Housatonic Rail Trail Improvements — iBerkshires (October 17, 2023) · web · checked Oct 31, 2026
    Supports: closure beginning at Main Street and running about 3,100 feet south on the town-owned section, for four to five weeks from the week of October 16, 2023; Community Preservation Act and DPW funds; aim to improve conditions for accessibility, bikes, strollers and pedestrians
  4. Housatonic Rail Trail — OpenStreetMap way 1571985877 · web · checked Oct 31, 2026
    Supports: ways named Housatonic Rail Trail tagged highway=cycleway, bicycle=designated, surface=fine_gravel, railway=abandoned (the mapped line, not history)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.