Howard Frankland Shared-Use Path

Greenway in Florida

Runs through St. Petersburg and Tampa · Pinellas and Hillsborough counties

Conditions now

Loading the weather near Tampa…

Forecast by the National Weather Service for Tampa · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.6 mi 12.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

St. Petersburg welcome tower (opens in a new tab)
St. Petersburg welcome tower · Photo: Beyond My Ken · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Howard Frankland Shared-Use Path is a 12-foot-wide path for pedestrians and cyclists on the north side of the new Howard Frankland Bridge, which carries Interstate 275 across Old Tampa Bay between St. Petersburg in Pinellas County and Tampa in Hillsborough County, Florida. The Florida Department of Transportation built it as part of its project for a new bridge span between 4th Street in Pinellas County and State Road 60 in Hillsborough County, which began in spring 2020. The path is nearly 7 miles long and separated from traffic by a barrier wall. It is not a rail-trail.

The new span opened to traffic in March 2025, and the path opened on May 27, 2026, together with the bridge's northbound express lanes. The original Howard Frankland Bridge was built in 1959 and a second span was added in 1990; that span was converted to carry northbound traffic and the original bridge has been removed. Reports put the cost of the whole project at about $973 million to $974 million.

The path is open every day from sunrise to sunset. Access points are at the north end of 4th Street in St. Petersburg and the south end of Reo Street in Tampa; further connections from Ulmerton Road and 4th Street North in St. Petersburg and at Reo Street in Tampa are being built under separate projects. Four shaded overlooks decorated with sail-shaped sculptures give views of Old Tampa Bay. The map line for this record measures about 7.6 miles in one piece, from the Pinellas approach in St. Petersburg across Old Tampa Bay to the Tampa approach near Executive Drive.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Tampa International Airport, 6.6 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F717478838890919190867974
Low °F535659657175777775696156
Precipitation, in2.62.62.52.52.67.47.896.12.31.42.6
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1921 St Petersburg sheet (1:62,500); the 1956 Gandy Bridge sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Northbound express lanes, shared-use path are open on the Howard Frankland Bridge — WUSF (May 27, 2026) · organization · checked Oct 16, 2026
    Supports: path opened May 27, 2026 with northbound express lanes, $973 million cost, new southbound span opened March 2025, original bridge built 1959, second span added 1990 and converted to northbound, original bridge removed, construction began 2020, Old Tampa Bay
  3. I-275 (Howard Frankland Bridge) new southbound bridge between Pinellas and Hillsborough counties - 422904-2-52-01 — FDOT Tampa Bay · web · checked Oct 16, 2026
    Supports: 12-foot-wide, barrier-separated shared-use path on the north side of the new bridge, nearly seven miles, four shaded sail-adorned overlooks, open daily sunrise to sunset, access at the north end of 4th Street in St. Petersburg and the south end of Reo Street in Tampa, future connections from Ulmerton Road, 4th Street North and Reo Street under separate projects, project limits 4th St (Pinellas) to SR 60 (Hillsborough), project start spring 2020
  4. Howard Frankland shared-use path, express toll lanes open — 83 Degrees Media (June 4, 2026) · web · checked Oct 16, 2026
    Supports: $974 million project figure, barrier wall separating the path from Pinellas-bound traffic, sail-shaped sculptures at the overlooks
  5. OpenStreetMap ways named Howard Frankland Shared-Use Path — OpenStreetMap · web · checked Oct 16, 2026
    Supports: the record's map line, its length and single piece; end points located by reverse geocoding with OpenStreetMap Nominatim (St. Petersburg, Executive Drive in Tampa)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.