Humbug-Willow Creek Trail
Greenway in California
Runs through Folsom · Sacramento County
Conditions now
Loading the weather near Folsom…
Forecast by the National Weather Service for Folsom · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Parkway Drive mile 4.2 directions to trailhead 1
- Parking at East Natoma Street mile 4.2 directions to trailhead 2
(opens in a new tab) About this trail
The Humbug-Willow Creek Trail is a paved multi-use path in Folsom, Sacramento County, California, built by the City of Folsom in segments. It is a creek greenway, not a rail-trail. State environmental filings record the city's Sun Country segment, a bike path with three small bridges and two boardwalks, approved in June 2000, and an Overlook segment of two bicycle and pedestrian bridges and 3,000 feet of Class I trail, filed with the state Department of Fish and Game in March 2003.
A running guide describes a route of up to 7 miles one way, starting off Folsom Boulevard and climbing gradually northeast, about 250 feet in all, through the Ridgeview and Parkway neighborhoods to the Parkway Neighborhood Park, past residential subdivisions in some stretches and open grassland in others. The southern end can be reached from the Willow Creek area or the Glenn light rail station, and a connector of about a mile leads to the Jedediah Smith Memorial Trail along Lake Natoma. This record maps about 5.6 miles of the trail's paths in northeastern Folsom, with access points on North Parkway Drive and East Natoma Street.
The city is still adding links. Its Class I Trail Connections Project, filed in June 2023, includes a 290-foot trail joining the Humbug-Willow Creek Trail to the bike lane on East Bidwell Street, carried on a raised modular bridge beside inactive rail tracks and above local flooding from the creek. The city's Folsom-Placerville Rail Trail project, filed in December 2023, would complete Class I segments from the Humbug-Willow Creek Trail east to Iron Point Road.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento 5 ESE, 29.7 km from the trail's middle, 103 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 62 68 74 81 89 94 94 89 79 65 56 Low °F 41 44 47 49 54 59 61 61 59 53 45 41 Precipitation, in 3.9 3.6 2.8 1.4 0.9 0.2 0 0 0.1 0.9 1.8 3.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1953 Clarksville sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Willow Creek Trail within 0.2 mi · 6.1 mi, paved
- Oak Parkway Trail within 0.2 mi · 2.3 mi, paved
- Empire Ranch Trail 0.4 mi away · 2.6 mi, paved
- Broadstone Trail 0.6 mi away · 2.2 mi, surface unknown
- Johnny Cash Trail 1.2 mi away · 2.5 mi, paved
- Folsom Parkway Rail Trail 1.4 mi away · 2.1 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City of Folsom Sun Country Segment, Humbug/Willow Creek Trail — CEQAnet · government source · checked Oct 15, 2026 Supports: City of Folsom lead agency, bike path with three small bridges and two boardwalks, approved June 26, 2000
- Humbug-Willow Creek Trail Overlook Segment — CEQAnet · government source · checked Oct 15, 2026 Supports: two bike/pedestrian bridges and 3,000 feet of Class I trail, Department of Fish and Game, March 2003
- Class I Trail Connections Project — CEQAnet · government source · checked Oct 15, 2026 Supports: City of Folsom, June 2023, East Bidwell Street connection of 290 feet, raised modular bridge parallel to inactive rail tracks, elevated above creek flooding
- Folsom-Placerville Rail Trail — CEQAnet · government source · checked Oct 15, 2026 Supports: City of Folsom, December 2023, Class I segments from the Humbug-Willow Creek Trail east to Iron Point Road
- Folsom: Humbug-Willow Creek Trail — Great Runs · web · checked Oct 15, 2026 Supports: paved multi-use path, up to 7 miles one way, start off Folsom Boulevard, 252-foot gradual climb northeast, Ridgeview and Parkway neighborhoods, Parkway Neighborhood Park, subdivisions and grassland, Willow Creek and Glenn light rail access, 1-mile connector to the Jedediah Smith Memorial Trail
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 15, 2026 Supports: mapped extent and access streets (North Parkway Drive, East Natoma Street)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.