States › Michigan

Huron River Greenway B2B

Greenway in Michigan

Runs through Ann Arbor Township, Superior Township (Washtenaw County) and Ypsilanti · Washtenaw County

Conditions now

Loading the weather near Ypsilanti…

Forecast by the National Weather Service for Ypsilanti · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.6 mi 5.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking for Gallup Park visitors mile 0 directions to Parking for Gallup Park visitors
  2. Parking for Gallup Park visitors mile 0.3 directions to Parking for Gallup Park visitors
  3. WCC Parking Lot 4 mile 0.7 directions to WCC Parking Lot 4
  4. WCC Health and Fitness Centre parking lot mile 0.8 directions to WCC Health and Fitness Centre parking lot
  5. WCC Parking Lot 3 mile 0.9 directions to WCC Parking Lot 3
  6. Lot A: Public mile 1.1 directions to Lot A: Public
  7. Parking at McAuley Drive mile 1.5 directions to trailhead 7
  8. Parking at McAuley Drive mile 1.6 directions to trailhead 8
  9. Parking at McAuley Drive mile 1.6 directions to trailhead 9
  10. Lot E: Staff mile 1.7 directions to Lot E: Staff
  11. Lot F: Public mile 1.7 directions to Lot F: Public
  12. Parking at McAuley Drive mile 1.7 directions to trailhead 12
  13. Parking at McAuley Drive mile 1.7 directions to trailhead 13
  14. Lot G: Staff mile 1.8 directions to Lot G: Staff
  15. Lot L: Public mile 1.8 directions to Lot L: Public
  16. Lot J: Public mile 1.9 directions to Lot J: Public
  17. Lot T: Staff mile 2 directions to Lot T: Staff
  18. Parking at North Hewitt Road mile 2.4 directions to trailhead 18
  19. Parking at North Hewitt Road mile 2.5 directions to trailhead 19
  20. EMU Rynearson stadium parking lot mile 2.6 directions to EMU Rynearson stadium parking lot
  21. EMU Rynearson stadium parking lot mile 2.7 directions to EMU Rynearson stadium parking lot
  22. Parking at Ainsley Street mile 3.4 directions to trailhead 22
  23. Green Lot mile 4 directions to Green Lot
  24. Parking at North Huron River Drive mile 4 directions to trailhead 24
  25. Physical Plant Lot mile 4.1 directions to Physical Plant Lot
Bike Trail Bordering the EMU West Campus, Ypsilanti, Michigan (opens in a new tab)
Bike Trail Bordering the EMU West Campus, Ypsilanti, Michigan · Photo: Dwight Burdette · CC BY 3.0 · Wikimedia Commons

About this trail

This record maps about 3.6 miles of the Border-to-Border (B2B) Trail in Washtenaw County, Michigan, from the east end of Ann Arbor's Gallup Park past Washtenaw Community College and on toward Eastern Michigan University in Ypsilanti. The B2B is a planned 55-mile non-motorized trail, about 43 miles of it complete; the Washtenaw County Parks & Recreation Commission oversees planning, construction and maintenance, and the Huron Waterloo Pathways Initiative raises private funds. A B2B section between Gallup Park and Geddes Dam has been closed since July 2026, when city staff found a sinkhole above corroded culverts beneath the trail embankment; Ann Arbor is evaluating repair options. The full trail has its own page.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Ann Arbor U Of Mich, 4.3 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323546607180848275624836
Low °F161825364756605952413022
Precipitation, in32.52.83.43.83.93.53.53.232.82.8
Snow, in18.315.38.32.6000000.14.112.7
Old maps

USGS topographic maps of the trail's middle go back to the 1902 South Lyon sheet (1:62,500); the 1965 Ann Arbor East sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. About B2B Trail — Border to Border · organization · checked Oct 15, 2026
    Supports: 55 miles planned, nearly 43 complete; WCPARC oversees planning, construction and maintenance; HWPI raises private funds; WCC and EMU among partners
  3. Ann Arbor Maintenance – Gallup Park Culvert Project — Border to Border (September 16, 2026) · organization · checked Oct 15, 2026
    Supports: closure between Gallup Park and Geddes Dam; July 2026 sinkhole; corroded culverts; city evaluating repair and replacement
  4. OpenStreetMap ways for this trail · web · checked Oct 15, 2026
    Supports: mapped length and route past Gallup Park, Washtenaw Community College and Eastern Michigan University

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.