I-84 Trail
Greenway in Oregon · OpenStreetMap relation
Runs through Portland, Gresham and Fairview (Multnomah County) · Multnomah County
Conditions now
Loading the weather near Gresham…
Forecast by the National Weather Service for Gresham · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Oregon Department of Transportation.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Northeast Rose Parkway mile 0.6 directions to trailhead 1
- Parking at Northeast Morris Court mile 0.6 directions to trailhead 2
- Parking at Northeast Morris Court mile 0.6 directions to trailhead 3
- Parking at Northeast Morris Court mile 0.6 directions to trailhead 4
- Parking at Northeast 137th Avenue mile 0.8 directions to trailhead 5
- Parking at Northeast Knott Street mile 1.8 directions to trailhead 6
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The I-84 Trail is a paved bicycle route of about 4.8 miles beside Interstate 84 in the Portland metropolitan area, Oregon. OpenStreetMap maps it as a bicycle route in the Metro regional network, lists the Oregon Department of Transportation as operator, and gives its distance as 5 miles.
The City of Gresham names the I-84 path as one of its major paths, along with the Springwater Corridor Trail and the Gresham-Fairview Trail, in a growing regional network linking Gresham to nearby cities, regional parks and natural areas. Gresham's Gresham-Fairview Trail Phase 4 project, a new 0.6-mile, 12-foot path along the west side of Northeast 201st Avenue between Northeast Halsey and Northeast Sandy, is described as including a new crossing that connects to the I-84 multi-use path. A Metro regional grant funds it.
Mapped access points include streets named Northeast Morris Court and Northeast Rose Parkway. Its history, exact endpoints and any closures could not be confirmed from the pages available.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Portland Wfo, 4.2 km from the trail's middle, 51 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 46 50 56 62 69 74 82 82 76 64 52 46 Low °F 36 37 40 43 48 53 57 57 53 46 41 36 Precipitation, in 6 4.5 4.7 3.6 2.8 2 0.7 0.6 1.6 4 6.3 7 Snow, in 1 0.9 0.1 0 0 0 0 0 0 0 0 1.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1918 Troutdale sheet (1:62,500); the 1954 Camas sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Gresham-Fairview Trail within 0.2 mi · 3.6 mi, paved
- I-205 Multi-Use Path 1.1 mi away · 13.4 mi, paved
- Marine Drive Trail 1.1 mi away · 16.1 mi, paved
- Sandy River Greenway 1.5 mi away · 3.7 mi, paved
- Wy'East Way Path 1.7 mi away · 2.2 mi, paved
- Springwater Trail 3.1 mi away · 18.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 11556039, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Bike Projects — City of Gresham · government source · checked Oct 17, 2026 Supports: I-84 path as part of Gresham's regional path network; Gresham-Fairview Trail Phase 4 length, location, crossing to the I-84 multi-use path, Metro funding
- OpenStreetMap relation 11556039 (I-84 Trail) · web · checked Oct 17, 2026 Supports: name, operator, 5 mi distance, paved surface, Metro network, street names at access points
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.