States › Maine

Interurban Multi-use Trail

Trolley trail in Maine

Runs through New Gloucester · Cumberland County

Conditions now

Loading the weather near Auburn…

Forecast by the National Weather Service for Auburn · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.1 mi 1.7 km1
On former railbed
0.5 mi 50%
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

New Gloucester, along the trail (opens in a new tab)
New Gloucester, along the trail · Photo: Shakers · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Interurban Multi-Use Trail is a trail in the Intervale Preserve in New Gloucester, Maine, a 328-acre preserve owned and managed by the Royal River Conservation Trust (RRCT). It follows the railbed of the Portland–Lewiston Interurban, an electric railway that ran through the preserve from 1914 to 1933. The line, a subsidiary of the Androscoggin Electric Company, ran 40 miles from Monument Square in Portland to Union Square in Lewiston; service ended on June 29, 1933, and the rails were lifted in 1934.

RRCT describes the Interurban Trail as a 0.46-mile multi-use and snowmobile trail; this record maps about 1.1 miles under the name, about half of it on the old railbed. Snowmobiles are allowed in the preserve only on the Interurban and Foxcroft multi-use trails, and a kiosk and bench stand where the two meet. The preserve can be entered where the Interurban crosses Route 231 (Intervale Road) at 419 Intervale Road, and parking on the shoulders of Grange Hall Road is allowed. RRCT counts walkers, runners, cyclists and snowmobilers among the trail's users.

Stormwater runoff, compaction and poor drainage have caused erosion, standing water and uneven ground on the trail. With a $78,234.55 Maine Trails Program grant awarded in November 2025, RRCT planned to rebuild it as a 5-foot-wide compacted gravel path with a crown, drainage dips about every 250 feet and trailside ditches, designed by FB Environmental and built by True North Trailworks. Work was set to begin in fall 2026, with the project areas closed to the public during construction, and to be finished by December 1, 2026.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

84% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Gray, 7.6 km from the trail's middle, 44 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303341536473797870584635
Low °F141625344454605952413121
Precipitation, in3.53.344.43.64.73.73.84.35.44.74.6
Snow, in20.620.416.24.7000000.63.817.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Gray sheet (1:62,500); the 1957 Gray sheet (1:62,500) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Intervale Preserve — Royal River Conservation Trust · organization · checked Oct 13, 2026
    Supports: New Gloucester location, 328 acres owned by RRCT, Interurban railbed through the preserve 1914–1933, snowmobiles only on the Interurban and Foxcroft multi-use trails, kiosk and bench at their junction, entry at 419 Intervale Road (Route 231), Grange Hall Road parking
  3. Intervale Preserve Improvements to Begin this Fall — Royal River Conservation Trust (Aug. 25, 2026) · organization · checked Oct 13, 2026
    Supports: 0.46-mile length, multi-use and snowmobile trail on the Portland–Lewiston line, users including cyclists, drainage and erosion problems, $78,234.55 Maine Trails Program grant (November 2025), planned gravel rebuild, FB Environmental and True North Trailworks, fall 2026 start, closures, completion by December 1, 2026
  4. Portland–Lewiston Interurban — Wikipedia · organization · checked Oct 13, 2026
    Supports: Androscoggin Electric Company subsidiary, 40 miles Monument Square to Union Square, service July 7, 1914 to June 29, 1933, rails lifted 1934

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.