States › Washington

Interurban Trail Milton

Trolley trail in Washington · OpenStreetMap relation

Runs through Federal Way, Milton and Fife · King and Pierce counties

Conditions now

Loading the weather near Milton…

Forecast by the National Weather Service for Milton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
2.7 mi 4.3 km1
On former railbed
2.5 mi 92%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 20th Street East mile 0 directions to trailhead 1
  2. Parking at 20th Street East mile 0 directions to trailhead 2
  3. Parking at Porter Way mile 1 directions to trailhead 3
  4. Parking at Kent Street mile 1.1 · restrooms directions to trailhead 4
Interurban Trail Milton drawn on the 1958 USGS topographic map of Seattle, Washington
Then: the 1958 USGS Seattle sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Interurban Trail Milton is a paved path of about 2.7 miles (4.3 km) in the city of Milton, Washington, on the corridor of the Puget Sound Electric Railway. That electric interurban began operating on September 25, 1902, and ran 38 miles between Tacoma and Seattle. It went through Fife to Milton, then turned southeast toward Puyallup. A federal judge allowed the company to suspend operations in a ruling on October 13, 1928; the final trains ran on December 30, 1928, and the rails were removed in 1930.

The City of Milton developed the trail, a project that combined 1.74 miles of existing city-owned right-of-way with the acquisition of 19.88 acres of abandoned Interurban Railroad right-of-way. The project description lists pedestrian and bicycle use, with interpretive viewpoints and picnic areas, and its status as completed.

Milton's section is one piece of the longer Interurban Trail (South). Wikipedia reports that, as of 2023, Edgewood, Milton and Fife had each opened paved segments that were not yet connected to the main Tukwila-to-Pacific section, and that gaps remained in Milton, Edgewood and Sumner as of 2024. The project plans connections west through Fife toward the Port of Tacoma and the Tacoma waterfront and east through Edgewood toward the Sumner-Pacific Trail.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

53% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Tacoma #1, 7 km from the trail's middle, 22 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485055606671777771615247
Low °F373740444953575753474037
Precipitation, in644.43.421.40.60.81.64.16.56
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Tacoma sheet (1:125,000); the 1949 Poverty Bay sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6554034, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Puget Sound Electric Railway - Wikipedia · organization · checked Oct 17, 2026
    Supports: 1902 opening, 38-mile Tacoma-Seattle route through Fife and Milton, 1928 suspension and final trains, rails removed 1930, gaps remaining in Milton as of 2024
  4. Interurban Trail (King County) - Wikipedia · organization · checked Oct 17, 2026
    Supports: paved segments in Edgewood, Milton and Fife not yet connected as of 2023, gaps to close
  5. Milton Interurban Trail - wildliferecreation.org · organization · checked Oct 17, 2026
    Supports: City of Milton as developer, 1.74 miles of city-owned right-of-way, 19.88 acres of abandoned right-of-way, planned connections, pedestrian and bicycle use, status completed
  6. OpenStreetMap relation 6554034 · web · checked Oct 17, 2026
    Supports: mapped length and paved surface

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.