States › Kansas

Iron Horse Trail

Greenway in Kansas

Runs through Abilene and Enterprise · Dickinson County

Conditions now

Loading the weather near Abilene…

Forecast by the National Weather Service for Abilene · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.9 mi 7.8 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Iron Horse Trail Abilene Trailhead mile 0 directions to Iron Horse Trail Abilene Trailhead
  2. Iron Horse Trail Enterprise Trailhead mile 4.9 directions to Iron Horse Trail Enterprise Trailhead
Rock Island Depot, beside the trail (opens in a new tab)
Rock Island Depot, beside the trail · Photo: HornColumbia · CC0 · Wikimedia Commons

About this trail

The Iron Horse Trail is a crushed-limestone multi-use trail of about 5 miles connecting Abilene and Enterprise in Dickinson County, Kansas. It runs alongside the active tracks of the Abilene & Smoky Valley Railroad, a rails-with-trails layout that Abilene tourism describes as one of the Midwest's few. The trail is meant for walkers, runners and cyclists.

The Abilene & Smoky Valley Railroad sponsored the project, with grants from the Sunflower Foundation, the Community Foundation of Dickinson County and the Quality of Life Coalition through Blue Cross and Blue Shield of Kansas. Phase 1, the Oard Trail, runs from Campbell Street east to Jeep Road beside the track; a later phase starts at Bridge Street in Enterprise and crosses the Smoky Hill River. Construction began in summer 2022, and a dedication was planned for May 31, 2025. The Dickinson County Trails Conservancy was named as the future maintainer.

The path is about eight feet wide and crosses creeks and the Smoky Hill River on bridges. OpenStreetMap marks trailheads in Abilene and Enterprise.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Abilene, 4.5 km from the trail's middle, 17 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434960707989949284715745
Low °F222535455565696759463424
Precipitation, in0.91.42.23.35.24.24.84.32.52.51.61.5
Snow, in4.12.81.70.2000000.212.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1889 Abilene sheet (1:125,000); the 1964 Abilene sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. America Likes Walking Trails - Abilene Kansas · organization · checked Oct 18, 2026
    Supports: 5 miles, crushed limestone, alongside Abilene & Smoky Valley Railroad, bridges, users
  3. Iron Horse Trail Groundbreaking - Abilene Kansas · organization · checked Oct 18, 2026
    Supports: sponsor, funders, Phase 1 and later phase routes, Dickinson County Trails Conservancy
  4. First of a Kind Iron Horse Trail - KSAL · web · checked Oct 18, 2026
    Supports: 5.5 miles in the report, eight feet wide, construction from summer 2022, May 31 dedication
  5. OpenStreetMap ways for this trail · web · checked Oct 18, 2026
    Supports: trailheads in Abilene and Enterprise

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.