States › Michigan

ITC Corridor Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Canton Township · Wayne County

Conditions now

Loading the weather near Westland…

Forecast by the National Weather Service for Westland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.4 mi 5.5 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Saltz Road mile 2.3 directions to trailhead 1
  2. Parking at Saltz Road mile 2.3 directions to trailhead 2
  3. Parking at Saltz Road mile 2.3 directions to trailhead 3
  4. Parking at Griffin Park East mile 2.9 directions to trailhead 4
ITC Corridor Trail drawn on the 1952 USGS topographic map of Wayne, Michigan
Then: the 1952 USGS Wayne sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The ITC Corridor Trail in Canton, Michigan, is a multi-use path of about 3 miles that runs beneath power lines maintained by ITC. The Canton Public Library describes it as a route for walkers, joggers and cyclists that connects several Canton parks, among them Griffin Park and Flodin Park, and ties into the Lower Rouge River Trail. It is a separate trail from the ITC Corridor Trail in Novi.

TrailLink gives the length as 2.97 miles, from Sheldon Road at Griffin Park to the Lower Rouge River Recreation Trail. The north end lies across Sheldon Road from Griffin Park, and a spur heads north into Flodin Park. The main line then follows the power lines south to the Lower Rouge River, where a crushed-stone trail continues east and west along the river. Near that junction, the Morton-Taylor Trailhead at Michigan Avenue and Morton Taylor Road serves the Lower Rouge trails, which the library describes as more than 3 miles of crushed-gravel paths and 5 miles of single-track.

The surface is crushed stone and nearly flat, with two brief road crossings. The corridor is mostly open, with little tree cover, though parts of the path run close to a line of trees. Parking is available at Griffin Park, off Sheldon Road several blocks north of Cherry Hill Road; at Flodin Park, off Saltz Road near Morton Taylor Road; and at the Morton-Taylor Trailhead north of Michigan Avenue.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Detroit Willow Run Airport, 9.6 km from the trail's middle, 31 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343748617282868477645038
Low °F202129395060636254433426
Precipitation, in1.71.42.13.13.3333.132.52.21.7
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Plymouth sheet (1:62,500); the 1952 Wayne sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6176624, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. All Around Canton: Take a Hike | Canton Public Library · organization · checked Oct 15, 2026
    Supports: ITC power-line route, multi-use, roughly 3 miles, connects Griffin Park and Flodin Park, ties into Lower Rouge River Trail, mostly open with little tree cover, parking at Flodin and Griffin parks, Morton-Taylor Trailhead location and Lower Rouge trail mileage, separate ITC Corridor Trail in Novi
  3. ITC Corridor Trail (Canton) | Michigan Trails | TrailLink · web · checked Oct 15, 2026
    Supports: 2.97-mile length, endpoints at Sheldon Road (Griffin Park) and Lower Rouge River Recreation Trail, spur to Flodin Park, route south to the Lower Rouge River, crushed stone surface, flat, two road crossings, shade near treeline, parking locations and directions

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.