James River Branch Trail
Greenway in Virginia
Runs through Richmond
Conditions now
Loading the weather near Richmond…
Forecast by the National Weather Service for Richmond · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Midlothian Turnpike mile 1.5 directions to trailhead 1
- Parking at Midlothian Turnpike mile 1.6 directions to trailhead 2
- Parking at Crutchfield Street mile 1.7 directions to trailhead 3
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The James River Branch Trail is a planned paved greenway on an inactive railroad right-of-way in Southside Richmond, Virginia, between Westover Hills Boulevard and Hopkins Road. WRIC reported in March 2024 that the corridor is about two miles long and crosses five roads, Westover Hills Boulevard, Midlothian Turnpike, Hull Street Road, East Broad Rock Road and Hopkins Road, with safety measures planned at the crossings. VPM reporting in 2022 gave the length as about 1.8 miles and said CSX Transportation was the seller of the right-of-way, with the city planning commission recommending purchase; the trail was first proposed in 2010 and links neighborhoods, employment centers and George Wythe High School.
WRIC put the cost at about $9 million from American Rescue Plan Act funds, with construction scheduled from winter 2024 to spring 2026 and subject to change. VPM reported the state would cover up to $4.028 million of the land purchase, and that planning documents call for paths at least 8 feet wide. OpenStreetMap shows paved pieces of the route mapped as of this record, about 1.8 miles in all; which sections are open, and which are still under construction, could not be confirmed from the pages read.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Richmond International Airport, 13.5 km from the trail's middle, 11 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 52 60 70 78 86 90 88 81 71 60 52 Low °F 29 30 37 46 56 64 69 68 61 49 39 32 Precipitation, in 3.2 2.6 4 3.2 4 4.6 4.4 4.9 4.6 3.4 3.1 3.5 Snow, in 3.7 2.2 1.1 0 0 0 0 0 0 0 0 1.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1894 Richmond sheet (1:62,500); the 1956 Richmond sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Virginia Capital Trail 2.4 mi away · 50.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Proposed rail-to-trail path could connect portions of Southside - VPM · organization · checked Oct 18, 2026 Supports: about 1.8 miles, CSX seller, proposed 2010, $4.028 million state land funding, paved at least 8 feet wide, George Wythe High School
- Officials accepting public input about James River Branch Trail project during meeting - WRIC · web · checked Oct 18, 2026 Supports: about 2 miles, termini, five crossings, $9 million ARPA, construction schedule winter 2024-spring 2026, March 25 2024 meeting
- OpenStreetMap · web · checked Oct 18, 2026 Supports: mapped paved extent, about 1.8 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.