John Barfield Trail
Greenway in Texas · OpenStreetMap relation
Runs through North Richland Hills · Tarrant County
Conditions now
Loading the weather near North Richland Hills…
Forecast by the National Weather Service for North Richland Hills · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The John Barfield Trail is a concrete hike-and-bike trail in North Richland Hills, Texas, that follows the wooded corridor of Little Bear Creek. The City of North Richland Hills registered its construction with the Texas Department of Licensing and Regulation as the John Barfield & Calloway Trails project, described as several miles of new trails with prefabricated bridges and drainage structures, scheduled from March 2013 to April 2014 at an estimated $2.8 million. It is a creek greenway, not a rail-trail.
TrailLink lists the trail at 3.5 miles between Little Bear Creek Park and the Cotton Belt Trail. At its east end it meets the Cotton Belt Trail, and at its west end it connects to the Fall Creek Trail and Little Bear Creek Linear Park in neighboring Keller. J.B. Sandlin Park, Tommy and Sue Brown Park and Founders Park lie just off the route. This record maps about 3.6 miles, including short links on Spring Oak Drive and Shadywood Lane that OpenStreetMap counts as part of the route.
Parking, restrooms and drinking fountains are at Northfield Park, 7804 Davis Boulevard, near the east end. The city also registered a trailhead for the John Barfield Trail at Fire Station No. 1, 8001 Shadywood Lane, with an estimated cost of $110,000 and a completion date of October 2016.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and October to January. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Ft Worth Wsfo, 11.3 km from the trail's middle, 3 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 59 67 75 82 90 94 94 87 77 65 57 Low °F 36 39 47 54 64 71 75 75 68 56 45 37 Precipitation, in 2.2 2.6 3.2 3.2 4.3 4.3 2.8 2.5 2.7 4.6 2.6 2.9 Snow, in 0.1 1.3 0.3 0 0 0 0 0 0 0 0 0.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1894 Fort Worth sheet (1:125,000); the 1959 Colleyville sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Little Bear Creek Trail within 0.2 mi · 1.8 mi, paved
- Cotton Belt Trail within 0.2 mi · 15.9 mi, paved
- Meandering Trail 0.4 mi away · 1.7 mi, paved
- Cross Timbers Trail 0.6 mi away · 1.5 mi, paved
- Rufe Snow Trail 1.1 mi away · 1.3 mi, surface unknown
- Walker's Creek Trail 1.3 mi away · 1.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17591649, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- John Barfield & Calloway Trails (EABPRJB3807414) — Texas Department of Licensing and Regulation, TABS · government source · checked Oct 15, 2026 Supports: City of North Richland Hills project; several miles of new trails, prefab bridges, drainage structures; March 2013 to April 2014; estimated $2.8 million
- John Barfield Trailhead at Firestation 1 (EABPRJB6809127) — Texas Department of Licensing and Regulation, TABS · government source · checked Oct 15, 2026 Supports: trailhead at Fire Station #1, 8001 Shadywood Lane; estimated $110,000; completion October 1, 2016; owner City of North Richland Hills
- John Barfield Trail — TrailLink · web · checked Oct 15, 2026 Supports: 3.5 miles, concrete, Little Bear Creek corridor; endpoints Little Bear Creek Park and Cotton Belt Trail; connections to Cotton Belt Trail, Fall Creek Trail and Little Bear Creek Linear Park in Keller; nearby J.B. Sandlin, Tommy and Sue Brown and Founders parks; Northfield Park parking, restrooms, fountains at 7804 Davis Blvd
- John Barfield Trail (relation 17591649) — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped length; route includes short sections of Spring Oak Drive and Shadywood Lane; concrete surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.