States › Georgia

Johns Creek Greenway

Greenway in Georgia · OpenStreetMap relation

Runs through Johns Creek · Fulton County

Conditions now

Loading the weather near Johns Creek…

Forecast by the National Weather Service for Johns Creek · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.7 mi 7.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Medlock Crossing Parkway mile 0.9 directions to trailhead 1
  2. Parking at Skyway Drive mile 3.6 directions to trailhead 2
  3. Parking at Abbotts Bridge Road mile 3.6 directions to trailhead 3
  4. Parking at Abbotts Bridge Road mile 3.6 directions to trailhead 4
  5. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 5
  6. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 6
  7. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 7
  8. Parking at Skyway Drive mile 3.7 directions to trailhead 8
  9. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 9
  10. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 10
  11. Parking at Skyway Drive mile 3.7 directions to trailhead 11
  12. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 12
  13. Parking at Skyway Drive mile 3.7 directions to trailhead 13
  14. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 14
  15. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 15
  16. Parking at Abbotts Bridge Road mile 3.7 directions to trailhead 16
  17. Parking at Skyway Drive mile 3.7 directions to trailhead 17
  18. Parking at Bell Road mile 4 directions to trailhead 18
Johns Creek Greenway (opens in a new tab)
Photo: nickoday · CC BY-SA 4.0 · Mapillary

About this trail

The Johns Creek Greenway is a multi-use path that runs mostly alongside Medlock Bridge Road (State Route 141) in Johns Creek, Fulton County, Georgia. A 2004 Phase I archaeological survey report listed by the University of Georgia's Laboratory of Archaeology describes the proposed trail as about 4.7 miles long and typically 10 feet wide with 2-foot shoulders. In 2021 Appen Media described the greenway as running along the west side of Medlock Bridge Road between Old Alabama Road and Hospital Parkway, part of a corridor trail and sidewalk network with gaps between some intersections and no trail south of Old Alabama Road.

The survey report gives the route as beginning at the intersection of Findley Road and Medlock Bridge Road and following Medlock Bridge Road south, with stretches along Bell Road, Abbotts Bridge Road, Old Medlock Bridge Road and State Bridge Road, crossing Parsons Road and St. Ives Country Club Parkway, then turning about 0.45 mile west from Old Alabama Road to end at Buice Road.

OpenStreetMap maps the greenway as a concrete cycleway designated for bicycles, with a wooden bridge near its southern end and a stretch on Old Medlock Bridge Road, a residential street mapped with a gravel surface. This record maps about 5.2 miles in seven pieces, from Findley Road at Medlock Bridge Road in the north to Buice Road near Old Alabama Road in the south.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Atlanta Peachtree Airport, 20.6 km from the trail's middle, 1 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525664738086898883736254
Low °F333642495866706963514136
Precipitation, in4.64.54.73.93.84.74.74.54.13.44.24.4
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Suwanee sheet (1:125,000); the 1956 Duluth sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12634047, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Phase I Archaeological Survey of the Johns Creek Multi-Use Greenway Trail, Fulton County, Georgia (Pietak, 2004, report 2619) — UGA Laboratory of Archaeology · organization · checked Oct 16, 2026
    Supports: about 4.7 miles; 10 feet wide with 2-foot shoulders; route from Findley and Medlock Bridge roads along Medlock Bridge Road (SR 141), Bell Road, Abbotts Bridge Road, Old Medlock Bridge Road and State Bridge Road, crossing Parsons Road and Saint Ives Country Club Parkway, west about 0.45 mile from Old Alabama Road to Buice Road
  3. Johns Creek plans intersection upgrades along busy Medlock Bridge Road — Appen Media (March 17, 2021) · web · checked Oct 16, 2026
    Supports: Johns Creek Greenway along the west side of Medlock Bridge Road between Old Alabama Road and Hospital Parkway; gaps in the corridor network, none south of Old Alabama Road
  4. Johns Creek Greenway (relation 12634047) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: concrete cycleway, bicycle designated; wooden bridge near the southern end; Old Medlock Bridge Road member (residential, gravel); this record's line: about 5.2 miles in seven pieces from Findley Road to Buice Road near Old Alabama Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.