States › Michigan

Kal-Haven Trail

Rail-trail in Michigan · OpenStreetMap relation

Runs through South Haven, South Haven Township, Geneva Township (Van Buren County), Columbia Township (Van Buren County), Bloomingdale Township, Gobles, Pine Grove Township, Oshtemo Township and 2 more · Van Buren and Kalamazoo counties

All 10 towns and places

South Haven, South Haven Township, Geneva Township (Van Buren County), Columbia Township (Van Buren County), Bloomingdale, Bloomingdale Township, Gobles, Pine Grove Township, Alamo Township and Oshtemo Township

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Kal-Haven Trail, formally known as the Kal-Haven Trail Sesquicentennial State Park, is a rail trail in the US that originally ran 33.5 miles (53.9 km) between South Haven, Michigan, to a point just west of the city of Kalamazoo, Michigan, where there is a trailhead. In 2008, the trail was extended east from the trailhead to downtown Kalamazoo as part of the Kalamazoo River Valley Trail.

From Wikipedia3 (CC BY-SA). Help improve the article and it improves here.

Managed by Van Buren County.5

Length
34.0 mi 54.7 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. South Haven Trailhead (Kal-Haven Trail State Park) mile 0 directions to South Haven Trailhead (Kal-Haven Trail State Park)
  2. Parking at East Wells Street mile 0.1 directions to trailhead 2
  3. Parking at Baseline Road mile 3.5 directions to trailhead 3
  4. Parking at County Road 687 mile 4.1 directions to trailhead 4
  5. Parking at County Road 388 mile 9.8 · restrooms directions to trailhead 5
  6. Parking at North Van Buren Street mile 16.1 · restrooms directions to trailhead 6
  7. Parking at East Kalamazoo Street mile 16.2 directions to trailhead 7
  8. Parking at Depot Street mile 20.6 directions to trailhead 8
  9. Parking at North 2nd Street mile 27.8 directions to trailhead 9
  10. Parking at North 10th Street mile 33.9 · restrooms directions to trailhead 10

Plan your visit

Links checked Oct 18, 2026, except those marked. Sources: Michigan DNR.

Kal-Haven Trail facing east towards Alamo, MI.jpg (opens in a new tab)
Kal-Haven Trail facing east towards Alamo, MI.jpg · Photo: Mtn-graphic · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Kal-Haven Trail, formally the Kal-Haven Trail Sesquicentennial State Park, is a 33.5-mile rail-trail between Kalamazoo and South Haven in Kalamazoo and Van Buren counties, Michigan. It follows the Kalamazoo and South Haven Railroad, built in 1870 mainly to carry lumber and abandoned in 1973. A state trail on the corridor was proposed in 1976 and met years of opposition from township boards and an adjoining landowners' group. Michigan bought the 36.5-mile right-of-way from the bankrupt Penn Central for $428,750, handing over the check at the Bloomingdale depot on January 13, 1988, and the trail opened on August 15, 1989, as the state's first linear park. Michigan DNR trail data lists the DNR as owner and administrator; Van Buren County took over day-to-day operation in 2004, and the Friends of the Kal-Haven Trail, a volunteer group, supports the DNR.

The trail runs from a trailhead on 10th Street just west of Kalamazoo to North Bailey Avenue in South Haven, passing through or near Alamo, Kendall, Gobles, Bloomingdale, Grand Junction and Kibbe. Bloomingdale sits near the midpoint and has a DNR trailhead with parking and vault toilets. Since 2008 the Kalamazoo River Valley Trail has carried the route east from the 10th Street trailhead into downtown Kalamazoo, using a 2004 tunnel under U.S. 131.

The surface is crushed limestone, which the friends group says can soften in wet weather and during spring thaw. Motorized vehicles are not allowed apart from snowmobiles, which may use the trail in winter once there is a 4-inch snow base; Class 1 e-bikes are allowed. A Van Buren County trail pass was dropped in 2011. In 2022 the trail was awarded $5 million in federal funds to resurface 17 miles of its western half, which had not been resurfaced since the trail opened, and to replace three bridges.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

50% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bloomingdale, 1.2 km from the trail's middle, 4 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323545587079838175624837
Low °F171825354656605851403123
Precipitation, in3.22.32.53.64.13.83.63.93.44.43.23
Snow, in35.922.97.91.7000000.57.332.8
Old maps

USGS topographic maps of the trail's middle go back to the 1946 Gobles sheet (1:62,500); the 1949 Gobles sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 said the western half was closed for rebuilding and reopened in May. One found it wider with thinned trees, and the old covered bridge had been replaced with new spans. r/Michigan, Feb 2024 · r/Michigan, May 2024
  • In 2024 one rider with a gravel bike described dirt and weathered limestone; another found the rebuilt west heavier going and sandy in spots, but workable on anything wider than skinny road tires. r/MichiganCycling, Jul 2023 · r/Michigan, May 2024
  • Replies in March 2025 put camping at Bloomingdale, including Shady Brook Park within half a mile of the trail; one said sites were free and first come, another said other trailside campgrounds had closed. r/CampAndHikeMichigan, Mar 2025
  • Riders in 2023 and 2025 put the out-and-back near 70 miles; one started in South Haven so the way back sloped down slightly, another said both ends had good parking. r/MichiganCycling, Jul 2023 · r/MichiganCycling, Apr 2025
8 Reddit threads about this trail, Jul 2023 to Apr 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 272890, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “Open”
  3. “Kal-Haven Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  4. Wikidata Q6349786, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  5. Van Buren County · Official site · checked Oct 31, 2026
  6. Statewide Railtrails layer, query for Kal-Haven — Michigan DNR Trails open data (ArcGIS REST) · government source · checked Oct 14, 2026
    Supports: crushed limestone surface, segments in Kalamazoo and Van Buren counties, DNR ownership and administration, biking permitted
  7. Kal-Haven Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: formal name, Kalamazoo and South Haven Railroad built 1870 for lumber, abandoned 1973, 1976 proposal and local opposition, $428,750 purchase from Penn Central with ceremony at Bloomingdale depot on January 13, 1988, 36.5-mile corridor, opening August 15, 1989 as Michigan's first linear park, Van Buren County operation from 2004, trail pass dropped 2011, communities along the route, 2004 U.S. 131 tunnel and 2008 extension as the Kalamazoo River Valley Trail
  8. Kal-Haven Trail — Friends of the Kal-Haven Trail · organization · checked Oct 14, 2026
    Supports: volunteer organization supporting the DNR, crushed limestone softens when wet and during spring thaw, no motorized vehicles, Class 1 e-bikes allowed, winter snowmobiling
  9. Plans emerge for improved Kal-Haven trailhead — Second Wave (June 30, 2011) · web · checked Oct 14, 2026
    Supports: 33.5-mile length, trailheads on 10th Street in Kalamazoo and North Bailey Avenue in South Haven, Bloomingdale midpoint trailhead on DNR land with gravel parking and vault toilets, snowmobiling with a 4-inch snow base
  10. Popular Kal-Haven Trail gets money for upgrades — Second Wave (July 20, 2022) · web · checked Oct 14, 2026
    Supports: $5 million in federal funds to resurface 17 miles, western half not resurfaced since the trail's creation, three bridges to be replaced

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.