States › West Virginia

Kanawha Boulevard Cycle Path

Greenway in West Virginia

Runs through Charleston · Kanawha County

Conditions now

Loading the weather near Charleston…

Forecast by the National Weather Service for Charleston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.0 mi 4.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Kanawha Boulevard East mile 0.5 directions to trailhead 1
  2. Parking at Veazy Street mile 0.5 directions to trailhead 2
  3. Parking at California Avenue mile 0.7 directions to trailhead 3
  4. Parking at California Avenue mile 0.7 directions to trailhead 4
  5. Parking at Quarrier Street East mile 0.7 directions to trailhead 5
  6. Parking at Quarrier Street East mile 0.7 directions to trailhead 6
  7. Private Parking mile 0.9 directions to Private Parking
  8. Parking at Holly Grove Parking mile 1 directions to trailhead 8
  9. Parking at Holly Grove Parking mile 1 directions to trailhead 9
  10. Parking at Kanawha Boulevard East mile 1.4 directions to trailhead 10
  11. Parking at Kanawha Boulevard East mile 1.4 directions to trailhead 11
  12. Parking at Kanawha Boulevard East mile 1.4 directions to trailhead 12
  13. Parking at Manor Place mile 1.4 directions to trailhead 13
  14. Parking at Kanawha Boulevard East mile 2.4 directions to trailhead 14
  15. Parking at Goshorn Street mile 2.7 directions to trailhead 15
  16. Parking at Truslow Street mile 2.8 directions to trailhead 16
  17. Parking at Starbucks Drive Thru mile 2.9 directions to trailhead 17
  18. Parking at Clendenin Street mile 2.9 directions to trailhead 18
  19. Parking at Kanawha Boulevard East mile 2.9 directions to trailhead 19
  20. Parking at Clendenin Street mile 2.9 directions to trailhead 20
  21. Parking at Virginia Street East mile 2.9 directions to trailhead 21
  22. Parking at Virginia Street East mile 2.9 directions to trailhead 22
  23. Parking at Starbucks Drive Thru mile 3 directions to trailhead 23

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

35th Street Bridge Charleston 2022b (opens in a new tab)
35th Street Bridge Charleston 2022b · Photo: Antony-22 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Kanawha Boulevard Cycle Path is a paved riverside path of about 3 miles beside Kanawha Boulevard (US 60) in Charleston, West Virginia, running east from Magic Island on the West Side along the north bank of the Kanawha River. State and city project documents call the corridor the Kanawha Boulevard Walk and Bikeway. The path is closed to motor traffic and passes within sight of the West Virginia State Capitol Complex.

West of Magic Island the riverfront path continues toward the Patrick Street Bridge as a two-lane cycle track with a separate pedestrian path; from Magic Island east it is a narrower asphalt path. Magic Island Park has a bike repair station, and parking under the Interstate 64 bridge gives access to the park and the trail.

The path lies within the Capitol Connector project, a City of Charleston project with the Federal Highway Administration and the West Virginia Division of Highways covering about 3.25 miles of Kanawha Boulevard from Magic Island to the base of the 35th Street Bridge, plus a quarter mile of Greenbrier Street. The existing pedestrian path is 4 to 6 feet wide; the plan narrows the city-owned section of the boulevard from four and five lanes to three and two to make room for about 3.5 miles of separated shared-use path at least 12 feet wide, with new crosswalks, 15 improved intersections, lighting and stormwater work. A $1.75 million federal RAISE grant paid for planning, which began in 2023, and a $25 million construction grant was awarded in January 2026, with construction hoped to begin in August or September once the design was approved.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Charleston Yeager Airport, 5.3 km from the trail's middle, 91 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444857697683868580695748
Low °F262935445362666457453630
Precipitation, in3.33.44.13.64.94.75.43.83.52.93.23.6
Snow, in10.37.75.90.5000000.61.55
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Charleston sheet (1:125,000); the 1957 Charleston East sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Charleston Capitol Connector — West Virginia Department of Transportation · government source · checked Oct 14, 2026
    Supports: corridor name Kanawha Boulevard Walk and Bikeway (US Route 60), sponsors (City of Charleston, FHWA, WVDOH), Magic Island to the base of the 35th Street Bridge about 3.25 miles plus 0.25 mile of Greenbrier Street, existing 4- to 6-foot pathway, lane reduction from four and five lanes to three and two, signal, stormwater and lighting work, RAISE grant
  3. $25 million in funding secured for Capitol Connector Project — WSAZ via Sen. Shelley Moore Capito (June 28, 2024) · government source · checked Oct 14, 2026
    Supports: 3.5 miles of separated shared-use path at least 12 feet wide, new crosswalks, 15 signalized intersections, lighting and stormwater improvements
  4. Construction grant awarded for Capitol Connector — WSAZ (January 21, 2026) · web · checked Oct 14, 2026
    Supports: $25 million Federal Highway Administration construction grant awarded in January 2026, Magic Island to the 35th Street Bridge, design submitted for approval, construction hoped for August or September
  5. First phase of Charleston's 'Capital Connector Project' underway — WCHS (January 6, 2023) · web · checked Oct 14, 2026
    Supports: planning under way in January 2023, $1.75 million federal RAISE grant for planning only, Magic Island to the 35th Street Bridge
  6. Kanawha Boulevard Trail — Komoot · web · checked Oct 14, 2026
    Supports: north bank of the Kanawha River, closed to motor traffic, State Capitol Complex along the route, two-lane cycle track with pedestrian path between the Patrick Street Bridge and Magic Island and narrower asphalt path beyond, Magic Island bike repair station, parking under the I-64 bridge

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.