Katy Trail (Denison)
Rail-trail in Texas · OpenStreetMap relation
Runs through Denison · Grayson County
Conditions now
Loading the weather near Denison…
Forecast by the National Weather Service for Denison · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Bullock Street mile 0.1 · water directions to trailhead 1
- Parking at Waterloo Lake Drive mile 0.4 · restrooms directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Katy Trail in Denison, Grayson County, Texas, is a city multi-use trail built on abandoned railroad right-of-way of the Missouri-Kansas-Texas Railroad, the line that earned Denison the nickname "Katy's Baby." The City of Denison Parks and Recreation department manages it as a shared-use path for walking, running, bicycling, wheelchairs, strollers and leashed dogs. Construction of Phase I began in August 2019.
Phase I runs about 1 mile from Day Street south to Loy Lake Road, where a pedestrian bridge carries the trail over the road; the map line on this page follows that section. Parking and the shared entrance for both phases are at the Backyard at Waterloo Lake Regional Park, 1101 Waterloo Lake Drive, near the dog park; the Day Street trailhead has no parking. The trail meets the park's paved walking track and the Woodland Loop at South Waterloo Lake Drive and Lang Avenue, and the park's soft-surface Waterloo Lake trails lie beyond.
Phase I is a 12-foot-wide concrete path with six railroad-inspired sculptures along the way. Phase II, about 1.3 miles from Loy Lake Road to Theresa Drive just south of Spur 503, is open as a soft-surface trail. The city council approved a TxDOT funding agreement for paving it in December 2024, and a state accessibility filing lists construction of the trail, a historic bridge and ADA ramps from July to November 2026 at an estimated $3.1 million.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 71% of this route as an abandoned rail line.
- Shade
51% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to April and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sherman, 8.3 km from the trail's middle, 21 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 65 73 80 88 92 93 85 75 63 54 Low °F 34 37 45 53 62 70 74 73 66 55 44 36 Precipitation, in 2.5 2.8 4 3.9 5.5 4.5 2.9 2.9 3.4 4.8 3.5 3.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1901 Denison sheet (1:125,000); the 1958 Sherman sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesCity of Denison Parks & Recreation: Trails
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15788027, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails — City of Denison, TX · government source · checked Oct 15, 2026 Supports: MKT railroad and "Katy's Baby" nickname, conversion of abandoned right-of-way, Phase I length, endpoints, 12-foot concrete, six sculptures; Phase II length, endpoints and soft surface; parking and entrance at 1101 Waterloo Lake Drive; Woodland Loop and paved walking track connections; Waterloo Lake trails
- Frequently Asked Questions: Parks & Recreation - Katy Trail — City of Denison, TX · government source · checked Oct 15, 2026 Supports: shared use by walkers, runners, bicyclists, wheelchairs, strollers and leashed dogs; parking near the dog park at Waterloo Lake Regional Park; no parking at the Day Street trailhead; Phase I 1 mile
- Project Details: Katy Trail Phase 2 (TABS2026006178) — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: Grayson County; Phase 2 scope (trail, historic bridge, ADA ramps), start 7/12/2026, completion 11/20/2026, estimated cost $3,099,801
- Phase one of Katy Trail construction nearing completion — KXII · web · checked Oct 15, 2026 Supports: Phase I construction began August 2019; path from Day Street south to Loy Lake Road; pedestrian bridge at Loy Lake Road
- Denison city council approves funding agreement for phase two of Katy Trail — KXII · web · checked Oct 15, 2026 Supports: December 2024 council approval of TxDOT funding agreement for Phase II; pedestrian bridge over Loy Lake Road; Phase II south to Spur 503
- Katy Trail (Denison), relation 15788027 — OpenStreetMap · web · checked Oct 15, 2026 Supports: the record's map line covers the Phase I concrete section from Day Street to the Loy Lake Road area
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.