Kennebec Central Railroad
Rail-trail in Maine
Runs through Chelsea and Randolph · Kennebec County
Conditions now
Loading the weather near Randolph…
Forecast by the National Weather Service for Randolph · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Kennebec Central Railroad was a 2 ft narrow gauge railroad operating between Randolph and Togus, Maine. The railroad was built to offer transportation for American Civil War veterans living at Togus to the nearby City of Gardiner. Tracks of 25-pound steel rails ran five miles from Randolph, Maine to the veterans home at Togus. Train service began on 23 July 1890.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
This record follows the bed of the Kennebec Central Railroad in Randolph, Maine, where about 1.5 miles of it is a woodland path known as the Old Narrow Gauge Trail. The Town of Randolph owns the right-of-way on this part of the roadbed, and a volunteer trail committee works to improve the trail; Maine Trail Finder lists the Friends of the Old Narrow Gauge Trail as its manager.
The Kennebec Central was a 2-foot narrow-gauge railroad that ran five miles from Randolph, across the Kennebec River from Gardiner, to Togus. It was built to carry Civil War veterans living at Togus to Gardiner, and train service began on July 23, 1890. Operations stopped abruptly on June 29, 1929, after the federal government awarded its coal-hauling contract to a trucking firm. Two of its locomotives were later trucked to Wiscasset for another narrow-gauge railroad, and its rails were scrapped.
The trail starts beside the IGA grocery on Water Street, where a sign marks the trailhead, and follows Little Togus Stream, crossing Windsor Street (Route 226) after about half a mile and continuing through the woods toward Birmingham Road, just under 2 miles from the start. The surface is dirt and forest floor, with shallow brook crossings and rough bridges built by volunteers; the far end is narrower, rougher and unmarked. Maine Trail Finder lists mountain biking and walking and notes that the trail can be muddy after heavy rain. The trail does not reach Togus.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
81% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Gardiner, 3.3 km from the trail's middle, 14 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 33 42 54 66 75 81 80 72 60 47 36 Low °F 9 10 21 33 44 54 60 58 50 39 29 18 Precipitation, in 3.6 3 3.7 4.2 3.7 4.4 3.4 3.6 3.9 5.4 4.5 4.4 Snow, in 17.6 20 12.7 2.8 0 0 0 0 0 0.2 2.3 13.3 - On the National Register
- Arnold Trail to Quebec, Coburn Gore · site, listed 1969 · nomination file for Arnold Trail to Quebec
- Old maps
USGS topographic maps of the trail's middle go back to the 1892 Gardiner sheet (1:62,500); the 1957 Gardiner sheet (1:62,500) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Kennebec River Rail Trail 0.5 mi away · 6.1 mi, paved
- Augusta Greenway Trail 3.8 mi away · 1.4 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Kennebec Central Railroad”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q1738785, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Kennebec Central Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: 2-foot gauge, five miles from Randolph to Togus across the river from Gardiner, built for Civil War veterans at Togus, service began July 23, 1890, suspended June 29, 1929 after the coal contract went to a trucking firm, locomotives trucked to Wiscasset, rails scrapped
- Old Narrow Gauge Rail Trail — Maine Trail Finder · web · checked Oct 13, 2026 Supports: Town of Randolph owns the right-of-way, volunteer trail committee, Friends of the Old Narrow Gauge Trail as manager, trailhead sign by the IGA on Water Street, Little Togus Stream, Windsor Street crossing about half a mile in, dirt and forest floor surface, shallow brook crossings, mountain biking and walking, muddy after heavy rain
- Old Narrow Gauge Trail, Randolph — Maine by Foot · web · checked Oct 13, 2026 Supports: just under 2 miles from Water Street to Birmingham Road, Windsor Street is Route 226, volunteer-built bridges, narrower and rougher unmarked far end
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.