States › Illinois

Kickapoo Rail Trail

Rail-trail in Illinois · OpenStreetMap relation

Runs through Urbana, St. Joseph, Ogden and Oakwood · Champaign and Vermilion counties

Conditions now

Loading the weather near Ogden…

Forecast by the National Weather Service for Ogden · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
11.8 mi 18.9 km1
On former railbed
6.6 mi 57%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Industial Circle mile 0.2 directions to trailhead 1
  2. Parking at South Elm Street mile 6.5 · restrooms directions to trailhead 2
  3. Parking at Lincoln Street mile 6.7 directions to trailhead 3
  4. Parking at North Main Street mile 6.7 directions to trailhead 4
  5. Parking at North Main Street mile 6.7 directions to trailhead 5
  6. Parking at 3rd Street mile 6.7 directions to trailhead 6
  7. Parking at North Main Street mile 6.7 directions to trailhead 7
  8. Parking at North 3rd Street mile 6.7 directions to trailhead 8
  9. Parking at East Warren Street mile 6.7 directions to trailhead 9
  10. Parking at West Warren Street mile 6.7 directions to trailhead 10
  11. Parking at North Main Street mile 6.7 directions to trailhead 11
  12. Parking at North 4th Street mile 6.8 directions to trailhead 12
  13. Parking at East Warren Street mile 6.9 directions to trailhead 13
  14. Parking at East Finley Avenue directions to trailhead 14
  15. Parking at East Finley Avenue directions to trailhead 15
  16. Parking at East Finley Avenue directions to trailhead 16
  17. Parking at East South Main Street directions to trailhead 17
  18. Parking at County Road 1720 N restrooms directions to trailhead 18
Ogden signpost (opens in a new tab)
Ogden signpost · Photo: Daniel Schwen · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Kickapoo Rail Trail is a multi-use trail on a retired railroad corridor in Champaign and Vermilion counties, Illinois, planned to run 24.5 miles from Urbana to Kickapoo State Park and the Vermilion County fairgrounds west of Danville. The Champaign County Forest Preserve District owns the corridor in Champaign County and the Vermilion County Conservation District owns it in Vermilion County; the Illinois Department of Natural Resources owns the bridge over the Middle Fork of the Vermilion River. The line was established in 1872, carried an electric interurban between Champaign-Urbana and Danville from 1903 until 1956, and served freight until its abandonment in the 1980s. The former CSX corridor was bought in 2013 and 2014.

Three sections are open: Urbana to St. Joseph (6.7 miles, opened 2017), Oakwood to Kickapoo State Park (3.1 miles, 2021) and 1.5 miles through Ogden (2022). Urbana access is at Weaver Park and by a spur from the Walmart parking lot. St. Joseph has a trailhead at Kolb Park and a parking lot beside the trail on North Fourth Street. In Vermilion County there is parking across from the Oakwood Village Hall and a trailhead with parking and restrooms just west of the trestle, which stands 88 feet above the Middle Fork and was named in June 2026 to honor the late State Senator Scott Bennett.

The trail is 10 feet wide with 2-foot shoulders and surfaced mainly in compacted crushed limestone, with asphalt at road approaches and in some towns; it is closed to motor vehicles. Using $11.2 million from the 2019 Rebuild Illinois capital plan, the managers expected the Urbana section, a Weaver Park pavilion and St. Joseph to Ogden to be finished in fall 2026 and Fithian to Oakwood in spring 2027. A gap of about 3 miles from Ogden to Fithian awaits funding, and another at Glover Crossing near St. Joseph awaits an at-grade crossing.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Sidell 4n, 20.3 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333749627382848378655038
Low °F172030415362646254433223
Precipitation, in2.422.84.24.74.64.73.22.73.33.32.5
Snow, in7.16.72.40.40000001.16
Old maps

USGS topographic maps of the trail's middle go back to the 1931 Fithian sheet (1:48,000); the 1968 Homer sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 8226778, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Kickapoo Rail Trail | Champaign County Forest Preserve District · organization · checked Oct 15, 2026
    Supports: 24.5 miles from Urbana to Kickapoo State Park; corridor purchased by CCFPD and Vermilion County Conservation District in late 2013 and 2014; partners including the Champaign County Design and Conservation Foundation
  3. Kickapoo Rail Trail Expansion | CCFPD · organization · checked Oct 15, 2026
    Supports: $11.2 million from the 2019 Rebuild Illinois Capital Plan via DCEO to CCFPD, Urbana Park District and VCCD; phases: Weaver Park trailhead, St. Joseph to Ogden, Ogden to Oakwood
  4. UPDATES | Kickapoo Rail Trail (onekrt.org) · organization · checked Oct 15, 2026
    Supports: fall 2026 completion of Urbana section, St. Joseph–Ogden and Weaver Park pavilion; Fithian–Oakwood spring 2027; about 3-mile Ogden–Fithian gap pending funding; Glover Crossing gap near St. Joseph pending an at-grade crossing
  5. Nature and History Along the Trail | Kickapoo Rail Trail (onekrt.org) · organization · checked Oct 15, 2026
    Supports: corridor established 1872; electric interurban between Champaign-Urbana and Danville from 1903 to 1956; freight until abandonment in the 1980s; Champaign County Design and Conservation Foundation; open sections Urbana–St. Joseph 6.7 mi (2017), Oakwood–Kickapoo 3.1 mi (2021), Ogden 1.5 mi (2022); trestle named in June 2026 for the late Senator Bennett
  6. FAQs | Kickapoo Rail Trail (onekrt.org) · organization · checked Oct 15, 2026
    Supports: parallels Route 150; Main Street in Urbana to the Vermilion County fairgrounds west of Danville; ownership by CCFPD, VCCD and IDNR (Middle Fork bridge); 10 feet wide with 2-foot shoulders; compacted crushed limestone with asphalt road approaches and possible in-town paving; non-motorized uses; Weaver Park about half a mile from the western terminus
  7. ACCESS POINTS | Kickapoo Rail Trail (onekrt.org) · organization · checked Oct 15, 2026
    Supports: Weaver Park, Walmart spur, Kolb Park, North Fourth Street lot in St. Joseph, Oakwood Village Hall parking, trailhead with parking and restrooms west of the Trestle Bridge
  8. It's happening: Kickapoo Rail Trail finally to be completed — Museum of the Grand Prairie newsroom (CCFPD) · organization · checked Oct 15, 2026
    Supports: corridor formerly owned by CSX; trestle 88 feet above the Middle Fork of the Vermilion River
  9. Kickapoo trail expansion receives $9.5 million in state funding — IPM Newsroom (2025) · organization · checked Oct 15, 2026
    Supports: construction began 2016; asphalt surface on sections running through town; remaining goals Weaver Park trailhead, St. Joseph–Ogden and Ogden–Oakwood

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.