Kiwanis Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Tecumseh, Raisin Township, Adrian Township and Adrian · Lenawee County
Conditions now
Loading the weather near Adrian…
Forecast by the National Weather Service for Adrian · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Kiwanis Trail is a rail to trail conversion in Adrian, Michigan that roughly follows the River Raisin.
From Wikipedia3 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Russell Road mile 0.7 directions to trailhead 1
- Kiwanis Trailhead mile 2.2 directions to Kiwanis Trailhead
- Parking at West Valley Road mile 6.2 directions to trailhead 3
- Parking at West Valley Road mile 6.2 directions to trailhead 4
- Parking at West Valley Road mile 6.2 directions to trailhead 5
- Parking at Bent Oak Avenue mile 8.6 directions to trailhead 6
- Parking at Riverside Avenue mile 8.6 directions to trailhead 7
- Parking at Riverside Avenue mile 8.6 directions to trailhead 8
- Parking at Riverside Avenue mile 8.7 directions to trailhead 9
- Parking at West Maumee Street mile 9.5 directions to trailhead 10
About this trail
The Kiwanis Trail is a paved rail-trail in Lenawee County, Michigan, running northeast from Adrian toward Tecumseh and roughly following the River Raisin. It occupies the former Detroit, Toledo and Ironton Railroad, a line that ran from Ironton, Ohio, to Detroit. The trail is the first component of a proposed River Raisin Greenway that would extend from Adrian to Manchester. A Kiwanis Regional Trail Authority, formed in 2020, led the cities and townships working to carry the trail into Tecumseh.
The southern end is at South Main Street (Business US 223 and M-52) in Adrian. Heading north, the trail passes Riverside Park at 0.3 mile, crosses Maumee Street (Business US 223) at 0.8 mile and reaches Trestle Park, with its covered bridge, at 1.1 miles; both parks have restrooms and parking. There is parking at Bent Oak Avenue, and a trestle carries the trail over Wolf Creek, which drains Lake Adrian into the River Raisin. The trail crosses West Valley Road at 4.2 miles and the busy North Adrian Highway (M-52) at 4.4 miles. For years it ended after about 8 miles at a parking area at Ives Road and Green Highway in Raisin Township, 1.5 miles south of Tecumseh.
The Tecumseh Connection, planned as an 8-foot-wide asphalt path of about 1.5 miles from the Green Highway and Ives Road trailhead to Cal Zorn Park, was funded in part through a 2021 crowdfunding campaign matched by the Michigan Economic Development Corporation's Public Spaces Community Places program. The extension had a soft opening on November 19, 2022, at Cal Zorn Park, at Russell Road and Raisin Center Highway. The trail surface is asphalt and concrete.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Adrian 2 NNE, 3.4 km from the trail's middle, 5 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 33 36 47 60 72 81 85 82 76 63 49 38 Low °F 17 18 26 36 47 56 60 59 51 40 30 23 Precipitation, in 2.2 2 2.5 3.5 4 4.1 3.4 3.6 3.3 3 2.8 2.3 Snow, in 9 5.8 4.1 1 0 0 0 0 0 0 1.3 4.8 - On the National Register
- Dennis and State Streets Historic District, Adrian · historic district, listed 1975 · nomination file for Dennis and State Streets Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 Fort Wayne sheet (1:250,000); the 1962 Adrian sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9768483, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “Open”
- “Kiwanis Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q24061925, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Kiwanis Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: rail-trail from Adrian to near Tecumseh roughly following the River Raisin; former Detroit, Toledo and Ironton Railroad (Ironton, Ohio, to Detroit); first component of the proposed River Raisin Greenway from Adrian to Manchester; crossing and mileage table (South Main Street terminus, Riverside Park 0.3 mi, Maumee Street 0.8 mi, Trestle Park 1.1 mi with covered bridge, Bent Oak Avenue parking, Wolf Creek trestle draining Lake Adrian, West Valley Road 4.2 mi, M-52 4.4 mi busy crossing, Ives Road and Green Highway 8.1 mi with parking 1.5 miles south of Tecumseh); asphalt and concrete surface
- Crowdfunding campaign launched for the Kiwanis Trail – Tecumseh Connection — Michigan Economic Development Corporation (May 14, 2021) · organization · checked Oct 15, 2026 Supports: Tecumseh Connection as an 8-foot-wide asphalt path of 1.5 miles from the Green Highway and Ives Road trailhead to Cal Zorn Park; 2021 crowdfunding campaign with MEDC Public Spaces Community Places matching grant; Kiwanis Regional Trail Authority leading the collaboration between cities and townships
- Kiwanis Trail — The Tecumseh Herald (tag page, 2016–2023 articles) · press · checked Oct 15, 2026 Supports: Kiwanis Regional Trail Authority formed (October 2020 article); trail previously ending at Ives Road and Green Highway in Raisin Township; extension soft opening Saturday, November 19, 2022, at Cal Zorn Park at Russell Road and Raisin Center Highway (November 16, 2022 article); unofficial opening in November confirmed (February 15, 2023 article)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.