Lake Apopka Connector Trail

Greenway in Florida · OpenStreetMap relation

Runs through Apopka and Clarcona · Orange County

Conditions now

Loading the weather near Apopka…

Forecast by the National Weather Service for Apopka · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.2 mi 6.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Lake Apopka Connector Trail drawn on the 1955 USGS topographic map of Orlando, Florida
Then: the 1955 USGS Orlando sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Lake Apopka Connector Trail is a paved multi-use trail in Apopka, Orange County, Florida, that joins the West Orange Trail to the Lake Apopka Loop Trail at Magnolia Park and completes a trail loop around Lake Apopka. Orange County Parks and Recreation lists it at 4.46 miles and gives its opening date as February 28, 2026. The Apopka Chief described it as running between Magnolia Park and Clarcona Horse Park and closing a 48.32-mile loop that links the West Orange Trail, the North Shore Trail and trails in Lake County.

Plans for a multi-use loop around the lake go back about 20 years. A first phase opened in 2012 from Magnolia Park to the Lake Apopka North Shore Trail, maintained by the St. Johns River Water Management District, and two pieces of the connector were built as part of the Oak Pointe North and Wynwood developments. Orange County Public Works issued the notice to proceed on the final 3.23-mile section in December 2024, from the West Orange Trail along McCormick Road to Magnolia Park, and officials broke ground on February 19, 2025, at the county's Northwest Water Reclamation Facility on West McCormick Road. The work cost about $10 million; the Florida Department of Transportation, the cities of Apopka and Ocoee and MetroPlan Orlando were among the partners.

The trail is asphalt and concrete, 10 to 14 feet wide, with a 100-foot boardwalk at the water reclamation facility and two rest areas. It is used by cyclists, walkers, runners and horseback riders. County trails are open from sunrise to sunset, pets must be on a leash of 6 feet or less, and Class 1 and Class 2 e-bikes are allowed on the county's paved trails. The mapped line here measures about 4.2 miles.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Orlando Executive Airport, 21.5 km from the trail's middle, 4 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F717478838891929290847873
Low °F525458636973757574686054
Precipitation, in2.62.12.72.73.78.28.17.76.53.21.72.3
Old maps

USGS topographic maps of the trail's middle go back to the 1955 Orlando sheet (1:250,000); the 1960 Apopka sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2832392, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Construction to begin on Lake Apopka Connector Trail — West Orange Times & Observer (December 11, 2024) · press · checked Oct 16, 2026
    Supports: Orange County Public Works notice to proceed in December 2024; 3.23-mile trail from the West Orange Trail along McCormick Road to the Lake Apopka Loop Trail at Magnolia Park; asphalt and concrete, 10 to 14 feet wide; 100-foot boardwalk
  3. The Lake Apopka Loop Trail is officially completed — West Orange Times & Observer (March 2, 2026) · press · checked Oct 16, 2026
    Supports: final connector opened Saturday, February 28, 2026, completing the loop; paved for cyclists, walkers, runners and equestrians
  4. Parks - Lake Apopka Connector Trail — Orange County, Florida · web · checked Oct 16, 2026
    Supports: 4.46 miles; opened February 28, 2026; address 2929 S Binion Rd, Apopka; trails open sunrise to sunset; leash of 6 feet or less; Class 1 and Class 2 e-bikes allowed on county paved trails
  5. Lake Apopka Connector Trail opens for recreational use — The Apopka Chief (March 2, 2026) · web · checked Oct 16, 2026
    Supports: $10.2 million, 4.46 miles from Magnolia Park to Clarcona Horse Park; 48.32-mile loop linking West Orange Trail, North Shore Trail and Lake County trails; horseback riders, cyclists, joggers, pedestrians; phase one opened 2012 from Magnolia Park to the North Shore Trail maintained by SJRWMD; loop plans nearly 20 years old; partners FDOT, Orange County Public Works, Apopka, Ocoee, MetroPlan Orlando
  6. Orange County breaks ground on $10 million phase 2 of Lake Apopka Connector Trail project — The Apopka Chief (February 19, 2025) · web · checked Oct 16, 2026
    Supports: groundbreaking February 19, 2025, at the Northwest Water Reclamation Facility on West McCormick Road; 3.23 miles, 10 to 14 feet wide; two rest areas, fences, gates, picket railing, 100-foot boardwalk; portions built with the Oak Pointe North and Wynwood developments; 2012 phase 1

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.