States › Tennessee

Lakeside Trail

Greenway in Tennessee

Runs through Bristol · Sullivan County

Conditions now

Loading the weather near Bristol…

Forecast by the National Weather Service for Bristol · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.0 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Vance Drive mile 1.9 · restrooms · water directions to trailhead 1
  2. Parking at Vance Drive mile 1.9 · restrooms · water directions to trailhead 2
Bristol, along the trail (opens in a new tab)
Bristol, along the trail · Photo: Aplomado · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Lakeside Trail is a gravel path of about 2 miles along the lake in Steele Creek Park, a city park of more than 2,200 acres in Bristol, Tennessee. The park's lake splits its system of about 20 trails into two sections, and the Lakeside Trail connects the two sides. MTB Project lists the City of Bristol as land manager.

The trail's southern end is at Rooster Front Park, on the back side of Steele Creek Park off Vance Drive, and its northern end is at the Mill Creek parking area off Broad Street, at the intersection with Spring Drive. The Beaver Creek Greenway links the Mill Creek lot with downtown Bristol. MTB Project rates the trail easy and describes it as a gravel pathway and double track. OpenStreetMap maps it as a shared path for walkers and cyclists, about 10 feet wide with a fine gravel surface, and shows a bridge along the way.

Parking at Rooster Front and at Mill Creek avoids the vehicle fee charged at the park's main entrance.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bristol Tri City Airport, 18.9 km from the trail's middle, 24 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F465159697784868681705950
Low °F262935435261656356443429
Precipitation, in3.63.843.83.83.953.82.82.53.13.8
Snow, in331.10.10000000.31.7
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Bristol sheet (1:125,000); the 1959 Bristol sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Steele Creek Park — Tennessee Eastman Hiking and Canoeing Club · organization · checked Oct 15, 2026
    Supports: 2,200+ acre city park south of Bristol, Tennessee; alternative parking at Mill Creek (Broad Street and Spring Drive) and Rooster Front (back side on Vance Drive) to avoid the entrance fee; the lake splitting the park's 20-trail system into two sections; Lakeside trail listed
  3. Lakeside Trail Mountain Bike Trail — MTB Project · web · checked Oct 15, 2026
    Supports: gravel pathway connecting the two sides of Steele Creek Park, rated easy, doubletrack, southern end at Rooster Front Park, northern end at Mill Creek parking area off Broad Street, Beaver Creek Greenway link to downtown Bristol, length about 2 miles, land manager City of Bristol, Tennessee
  4. Lakeside Trail (way 356377395) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: cycleway designated for bicycles and pedestrians, fine gravel surface, 3 m width
  5. Lakeside Trail (way 1546790696) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: bridge on the trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.