States › Utah

Lakeview Parkway Trail

Greenway in Utah

Runs through Provo · Utah County

Conditions now

Loading the weather near Provo…

Forecast by the National Weather Service for Provo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.7 mi 7.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Lakeview Parkway mile 4 directions to trailhead 1

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Bend in Provo River Trail - panoramio - planetary nebula (opens in a new tab)
Bend in Provo River Trail - panoramio - planetary nebula · Photo: planetary_nebula · CC BY 3.0 · Wikimedia Commons

About this trail

The Lakeview Parkway Trail is a paved path beside Lakeview Parkway, a connector street on the south and west sides of Provo, Utah. The Provo City Library describes the 3.7-mile Lakeview Parkway and trail as running from I-15 to the Provo Municipal Airport, with the trail parallel to the road on its south side. The parkway, about 8.1 miles long and not yet complete, serves the airport and the Provo High School campus that opened in 2019; when finished it is to run from Geneva Road (SR-114) in southern Orem to South State Street (US 89).

The library lists access points at 1860 South, where a walkway crosses I-15 from the East Bay Technology Park, and at 500 West, 1100 West and 3110 West near the airport. North of the airport the parkway follows the former South 3110 West alignment, crosses West Center Street and bridges the Provo River and the Provo River Parkway on its way north past Provo High School.

OpenStreetMap maps about 4.7 miles of path under this name, from near I-15 west along the parkway's southern leg to the airport and then north to a point beyond West Center Street.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Provo Byu, 5 km from the trail's middle, 23 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414858667687959383685341
Low °F242835404755626152413224
Precipitation, in1.91.61.61.920.90.50.71.21.61.41.8
Snow, in12.58.743.10.200000.64.611.2
Old maps

USGS topographic maps of the trail's middle go back to the 1885 Salt Lake sheet (1:250,000); the 1950 Provo sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. What to Do in Provo: The Great Outdoors — Provo City Library · government source · checked Oct 17, 2026
    Supports: 3.7-mile trail from I-15 to the airport, south side of the road, access points at 1860 South (walkway over I-15), 500 West, 1100 West and 3110 West
  3. Lakeview Parkway (Utah County, Utah) — Wikipedia · organization · checked Oct 17, 2026
    Supports: parkway length, airport and Provo High School (2019), planned termini, 3110 West alignment, Center Street crossing, Provo River and Provo River Parkway bridges
  4. OpenStreetMap ways named Lakeview Parkway Trail — OpenStreetMap · web · checked Oct 17, 2026
    Supports: mapped length and extent

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.