Lehigh Trail
Rail-trail in Florida · OpenStreetMap relation
Runs through Palm Coast · Flagler County
Conditions now
Loading the weather near Palm Coast…
Forecast by the National Weather Service for Palm Coast · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Old Kings Road South mile 2 directions to trailhead 1
- Parking mile 3.7 directions to trailhead 2
- Parking at Belle Terre Parkway mile 3.8 directions to trailhead 3
- Parking at Royal Palms Parkway mile 5.6 directions to trailhead 4
(opens in a new tab) About this trail
The Lehigh Trail, also called the Lehigh Greenway Rail Trail, is a paved rail-trail in Flagler County, Florida, built on approximately 8 miles of abandoned railroad corridor covering 194.95 acres. It is a Flagler County facility. Its east end, at Colbert Lane, lies immediately west of the old Lehigh Portland Cement Company. The Florida Department of Transportation provided most of the money for the design, permitting and construction of the trail between Colbert Lane and U.S. 1; the segment from Belle Terre Parkway to U.S. 1 was completed in 2010, and in 2011 the county reported plans to extend the trail toward Bunnell, from East Woodland Street to Royal Palms Parkway.
The trail runs east-west from U.S. 1 north of Bunnell through the town center of Palm Coast and Graham Swamp to Colbert Lane, paralleling the Lehigh Canal for much of the way. It has only two grade crossings, at Old Kings Road and Belle Terre Parkway. Graham Swamp is a preserve of about 3,000 acres owned by the St. Johns River Water Management District, which in 2013 agreed to turn it over to Flagler County. Near Interstate 95 a spur follows Town Center Boulevard and Central Avenue to Central Park in Palm Coast.
The surface is asphalt, 8 to 12 feet wide, and trees line the trail for nearly its whole length. The Colbert Lane trailhead, built with a $600,000 FDOT grant on water management district land and dedicated on July 15, 2013, has 30 parking spaces, restrooms and a water fountain; there is also parking off Belle Terre Parkway and U.S. 1. Published lengths differ: TrailLink lists 8.71 miles, while 100 Florida Trails gives 6.7 miles plus connectors. The map line for this record measures about 6.7 miles.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
71% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Palm Coast 6ne, 15 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 65 68 72 78 83 86 88 88 86 81 74 68 Low °F 49 52 56 62 70 76 76 77 76 69 60 53 Precipitation, in 3.3 3.6 3.1 2.5 2.8 5.9 6.3 6.4 7.7 4.5 2.5 2.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1937 Ormond sheet (1:48,000); the 1956 Flagler Beach West sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Apr 2024
- Daytona Beach suggestions? r/DaytonaBeach · Apr 2024 · 26 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/florida
Nearby trails
- Graham Swamp Trail within 0.2 mi · 1.9 mi, surface unknown
- Flagler Beach to Marineland Trail 1.2 mi away · 5.3 mi, surface unknown
- Linear Park Trail 4.2 mi away · 9.1 mi, paved
- Saint Joe Walkway 4.3 mi away · 2.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1992730, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- County: Lehigh Trail to be improved, extended — Palm Coast Observer · press · checked Oct 16, 2026 Supports: FDOT funded most design, permitting and construction between Colbert Lane and U.S. 1, Belle Terre Parkway to U.S. 1 segment completed in 2010, extension toward Bunnell to Royal Palms Parkway, Colbert Lane trailhead grant
- County to dedicate Lehigh Trailhead on July 15 — Palm Coast Observer · press · checked Oct 16, 2026 Supports: county facility, trailhead dedication July 15, 2013, 30 parking spaces, restrooms, water fountain, $600,000 FDOT grant, built on St. Johns River Water Management District land, Graham Swamp Preserve 3,000 acres turned over to the county
- Lehigh Trail — Palm Coast and the Flagler Beaches (Visit Flagler) · web · checked Oct 16, 2026 Supports: approximately eight miles of abandoned railroad corridor, 194.95 acres, Lehigh Canal, U.S. 1 north of Bunnell through Palm Coast town center and Graham Swamp to Colbert Lane immediately west of the old Lehigh Portland Cement Company, only two grade crossings at Old Kings Road and Belle Terre Parkway, parking off Belle Terre Pkwy and US 1, trees nearly the entire distance
- Lehigh Greenway Rail Trail — TrailLink · web · checked Oct 16, 2026 Supports: alternate name, 8.71 miles, asphalt, spur along Town Center Blvd. and Central Ave. to Central Park
- Lehigh Greenway Rail Trail — 100 Florida Trails · web · checked Oct 16, 2026 Supports: 6.7 miles plus connectors, paved 8 to 12 feet wide, east-west
- OpenStreetMap relation 1992730 — OpenStreetMap · web · checked Oct 16, 2026 Supports: length of the record's map line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.