States › Indiana

Liberty Mills Trail

Greenway in Indiana

Runs through Fort Wayne · Allen County

Conditions now

Loading the weather near Fort Wayne…

Forecast by the National Weather Service for Fort Wayne · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Liberty Mills Road mile 0 directions to trailhead 1
  2. Parking at Falls Drive mile 0 directions to trailhead 2
  3. Parking at Falls Drive mile 0 directions to trailhead 3
  4. Parking at Falls Drive mile 0 directions to trailhead 4
  5. Parking at Falls Drive mile 0 directions to trailhead 5
  6. Parking at Morning Sun Drive mile 0.7 directions to trailhead 6
  7. Parking at Liberty Mills Road mile 1 directions to trailhead 7
  8. Parking at Liberty Mills Road mile 1.1 directions to trailhead 8
  9. Parking at Homestead Road mile 1.3 directions to trailhead 9
  10. Parking at Liberty Mills Road mile 1.3 directions to trailhead 10
  11. Parking at Liberty Mills Road mile 1.3 directions to trailhead 11
  12. Parking at Hopkinton Court mile 1.3 directions to trailhead 12
Fort Wayne, along the trail (opens in a new tab)
Fort Wayne, along the trail · Photo: Momoneymoproblemz · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Liberty Mills Trail is a paved shared-use path beside Liberty Mills Road in southwest Fort Wayne, Indiana, in Aboite Township. It is a sidepath, not a rail-trail. The City of Fort Wayne, which plans, builds and maintains most of the trails inside its limits, completed its newest section in 2024: a 0.75-mile, 10-foot-wide extension from Middle Grove Road to the intersection of Falls Drive and Coventry Lane, connecting the existing trail to the Village at Coventry shopping center. Construction began in early 2023, the city lists the project as complete on August 31, 2024, and a ribbon-cutting with Mayor Sharon Tucker followed on September 4, 2024. The $1.49 million project was paid for through the Coventry Lane tax increment financing district and part of the city's American Rescue Plan Act allocation. API Construction Corp. built it to a design by A&Z Engineering, and several property and business owners donated right of way.

The record maps about 2.2 miles along Liberty Mills Road, from near Amber Road in the west to Falls Drive in the east. With the 2024 section, the trail connects to more than 17.75 miles of existing trails in Aboite Township and links nearby neighborhoods, businesses and churches with the Village at Coventry and the Aboite Library.

The trail serves bicyclists, walkers, runners and users of mobility aids. The 2024 section added a boardwalk, ADA curb ramps, retaining walls, signage, a park bench and pavement markings. OpenStreetMap tags parts of it as asphalt.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Ft Wayne International Airport, 9.2 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333648617281848276644938
Low °F182129395060646153433324
Precipitation, in2.52.12.83.74.64.543.83332.5
Snow, in10.87.84.60.8000000.11.97.6
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Fort Wayne sheet (1:250,000); the 1961 Arcola sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Liberty Mills Road Trail — Engage Fort Wayne (City of Fort Wayne) · organization · checked Oct 15, 2026
    Supports: 0.75-mile, 10-foot-wide extension from Middle Grove Road to Falls Drive and Coventry Lane; connection to Village at Coventry Plaza; users; boardwalk, curb ramps, retaining walls, signage, bench, pavement markings; construction from early 2023; complete August 31, 2024; $1.49 million, Coventry Lane TIF and ARPA funding; connects to over 17.75 miles of trails in Aboite Township; city plans, builds and maintains most trails in city limits
  3. Ribbon Cutting Celebrates The Completion Of The Liberty Mills Road Trail — Fort Wayne Trails · organization · checked Oct 15, 2026
    Supports: ribbon-cutting on September 4, 2024 with Mayor Sharon Tucker; contractor API Construction Corp.; design by A&Z Engineering; donated right of way; access to neighborhoods, businesses, churches, the Village at Coventry and the Aboite Library
  4. Liberty Mills Trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped route along Liberty Mills Road from near Amber Road to Falls Drive; asphalt surface tag on parts of the path

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.