LINC Trail
Greenway in Georgia
Runs through Newnan · Coweta County
Conditions now
Loading the weather near Newnan…
Forecast by the National Weather Service for Newnan · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Newnan Crossing Boulevard mile 3.2 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The LINC is a multipurpose trail system in Newnan, Georgia, built on public rights of way and greenspace. Its name is not an acronym but a stylized spelling of "link," for the way it ties parts of the city together. The City of Newnan Council and the Coweta County Commission approved the LINC Master Plan in the spring of 2017; the plan, dated May 23, 2017, was drawn up by the PATH Foundation and the Kaizen Collaborative. The Citizen described the planned network as 26 miles in 2023, while the Friends of LINC, the nonprofit that supports the trail, now describe a 65-mile network. Construction has been funded through SPLOST, a special-purpose local option sales tax.
The first phase opened in January 2019. Section C, called "the Missing LINC," joined the Summergrove area to downtown Newnan, and with it the city completed all of the fully designed sections, A through D, and the Newnan Centre LINC. A bridge at Greison Trail, installed between August and December 2022, connected the east and west sections, and a ribbon cutting on February 17, 2023 marked the link. The Friends of LINC map the trail in five stretches: Summergrove to Newnan Crossing Boulevard, on to Ashley Park, Greison Trail, CJ Smith Park and downtown, where the trail is to end at the old railroad depot that houses the Newnan Coweta Historical Society.
The path is paved and 12 feet wide, open to walkers, runners, skaters and cyclists; motorized vehicles, golf carts included, are banned. Mile marker 0 is at Market Square near Summergrove. Trailhead parking is at the Newnan Centre, 1515 Lower Fayetteville Road, and on Summerlin Road near Newnan Crossing Elementary School; CJ Smith Park, between Farmer and Murray streets, has parking, restrooms and a pump track. This record's map line, about 4.8 miles, runs from Market Square Road west to the edge of downtown.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Newnan 7 WNW, 13.8 km from the trail's middle, 40 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 60 67 75 81 87 90 89 84 74 66 57 Low °F 31 34 39 47 56 65 68 68 62 49 39 33 Precipitation, in 4.9 5 5.4 4.2 3.7 3.9 4.7 4.6 3.9 3 4.1 5.1 Snow, in 0.8 0.2 0.3 0 0 0 0 0 0 0 0 0.4 - On the National Register
- Newnan Cotton Mill and Mill Village Historic District, Newnan · historic district, listed 2002 · nomination file for Newnan Cotton Mill and Mill Village Historic District
- Cole Town District, Newnan · historic district, listed 1982 · nomination file for Cole Town District
- Chalk Level Historic District, Newman · historic district, listed 2026
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 Atlanta sheet (1:250,000); the 1965 Newnan North sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of LINC
- FacebookFriends of LINC (Facebook)
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- About LINC — Friends of LINC · organization · checked Oct 16, 2026 Supports: multipurpose trail on public rights of way and greenspace; 65-mile network of paved paths in Newnan; walkers, runners, skaters, bicyclists
- LINC Master Plan — Friends of LINC · organization · checked Oct 16, 2026 Supports: City Council and County Commission approved the master plan in spring 2017; dated May 23, 2017; PATH Foundation and Kaizen Collaborative
- East and West Sections Connected — Friends of LINC · organization · checked Oct 16, 2026 Supports: Greison Trail bridge installed August to December 2022, connecting east and west sections; ribbon cutting Friday, February 17
- Maps — Friends of LINC · organization · checked Oct 16, 2026 Supports: five mapped sections from Summergrove to downtown
- Amenities — Friends of LINC · organization · checked Oct 16, 2026 Supports: mile marker 0 at Market Square near Summergrove; Newnan Centre trailhead at 1515 Lower Fayetteville Rd; Summerlin Road parking near Newnan Crossing Elementary; CJ Smith Park parking, bathrooms, pump track; terminus at the old railroad depot (Newnan Coweta Historical Society)
- Newnan celebrates opening of latest section of 26-mile multi-purpose trail — The Citizen (February 8, 2023) · web · checked Oct 16, 2026 Supports: name a stylized spelling of 'link'; planned 26-mile network; first phase opened January 2019; Section C 'the Missing LINC' joining Summergrove to downtown; sections A through D and Newnan Centre LINC complete; SPLOST funding; public rights-of-way and greenspace; 12-foot paved path; users allowed; motorized vehicles and golf carts banned
- Way: LINC Trail — OpenStreetMap · web · checked Oct 16, 2026 Supports: record's ways tagged LINC Trail, paved cycleway; line from Market Square Road west toward downtown; about 4.8 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.