States › Illinois

Lincoln Prairie Grass Trail

Greenway in Illinois · OpenStreetMap relation

Runs through Mattoon and Charleston · Coles County

Conditions now

Loading the weather near Charleston…

Forecast by the National Weather Service for Charleston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
12.2 mi 19.6 km1
On former railbed
7.8 mi 65%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Division Street mile 2.3 directions to trailhead 1
  2. Parking at Shelby Avenue mile 11.9 directions to trailhead 2
  3. Parking at Shelby Avenue mile 11.9 directions to trailhead 3
  4. Parking at North 10th Street mile 12.1 directions to trailhead 4

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Charleston, along the trail (opens in a new tab)
Charleston, along the trail · Photo: jrmyers · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Lincoln Prairie Grass Trail is a 10-foot-wide shared-use path of about 12 miles connecting Mattoon and Charleston in Coles County, Illinois. The two cities own it: Mattoon maintains the part west of Loxa Road and Charleston the part east of it. The trail follows a railroad alignment built around 1856 by the Terre Haute & Alton Railroad Company. Trains stopped running in 1981, when Conrail was the last operator; Conrail sold the right-of-way in 1984 to Central Illinois Public Service Company (CIPS) for electric transmission lines, and CIPS transferred it to Mattoon and Charleston in 1988. CIPS, now Ameren, keeps easements for its power lines along the trail. The trail was built in 1998 with federal ISTEA funds and local matching money from both cities.

For years only the in-town sections in Mattoon and Charleston were paved, with an aggregate surface between them. In October 2016 Charleston won an $800,000 Illinois Transportation Enhancement Program grant toward paving the whole trail, and construction was set to begin in June 2020. The project's 2019 design report called for resurfacing the 8.82-mile gravel section from Logan Street in Mattoon to E Street in Charleston with asphalt, extending the west end about half a mile from 10th Street to the Amtrak depot at 1718 Broadway Avenue in Mattoon, and linking Eastern Illinois University to the trail with bike lanes on 6th and 7th streets in Charleston.

The state tourism office now describes the trail as paved and open to bicyclists and walkers, with no motorized traffic allowed. Parking is at the 10th Street ball fields and by the Roundhouse Complex on Shelby Avenue in Mattoon, midway where the trail crosses Loxa Road, at a small lot in Charleston where Madison Avenue and CR 7/Old State Road run parallel, and at the ball fields on Division Street in Charleston.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 94% of this route as a trail on former railroad right-of-way.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Mattoon Coles County Airport, 3.2 km from the trail's middle, 14 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F354052647483868479665140
Low °F202433435463666456453526
Precipitation, in21.82.24.13.94.742.42.93.131.8
Old maps

USGS topographic maps of the trail's middle go back to the 1934 Mattoon sheet (1:62,500); the 1958 Decatur sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 7397749, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Lincoln Prairie Grass Trail Project Development Report (May 30, 2019) — City of Mattoon · government source · checked Oct 14, 2026
    Supports: connects Mattoon and Charleston in Coles County; 10-foot shared-use path; Mattoon maintains west of Loxa Road, Charleston east; built 1998 with ISTEA and local funds; Terre Haute & Alton Railroad circa 1856; train use ended 1981; Conrail last operator; sale to CIPS 1984; transfer to the cities 1988; Ameren easements; in-town portions paved and aggregate between; proposed 8.82-mile resurfacing from Logan Street to E Street, 10th Street to Amtrak depot extension, EIU bike lanes on 6th and 7th streets
  3. Construction set to begin on Lincoln Prairie Grass Trail — The Daily Eastern News (June 2, 2020) · press · checked Oct 14, 2026
    Supports: 12-mile trail; project to pave the entire trail with only two miles paved; $800,000 ITEP grant awarded to Charleston in October 2016; construction beginning that week
  4. From a rail to a trail — The Daily Eastern News (Aug. 31, 2007) · press · checked Oct 14, 2026
    Supports: Charleston and Mattoon both own the trail; Charleston maintains to Loxa Road, Mattoon beyond
  5. Lincoln-Prairie Grass Trail — Enjoy Illinois (Illinois Office of Tourism) · web · checked Oct 14, 2026
    Supports: 12-mile paved trail linking Mattoon and Charleston; bicyclists and walkers, no motorized traffic; parking locations in Mattoon, at Loxa Road and in Charleston

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.