States › Illinois

Lincoln Prairie Trail

Rail-trail in Illinois · OpenStreetMap relation

Runs through Taylorville and Owaneco · Christian County

Conditions now

Loading the weather near Owaneco…

Forecast by the National Weather Service for Owaneco · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
14.4 mi 23.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at N 2000 East Road mile 14.6 directions to trailhead 1
Taylorville, along the trail (opens in a new tab)
Taylorville, along the trail · Photo: Dre Waters · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Lincoln Prairie Trail is a multiuse path of about 15 miles in Christian County, Illinois, connecting Pana and Taylorville. It opened in 2001 on a former railroad bed and follows the general route Abraham Lincoln traveled while working the Eighth Judicial Circuit as an attorney and later as a judge. TrailLink lists the City of Pana as its owner. The Lincoln Prairie Trails Conservancy, a volunteer group formed in 2017, works to improve and preserve the trail and has added two trailhead facilities, signage, water stations, bike racks, repair stations and a native plant garden. The group would like to see the trail joined to the Lost Bridge Trail, which would connect Pana to Springfield.

The paved trail begins at a parking lot at Illinois Route 29 and East 350 North Road in northwest Pana and runs to Taylorville, using short, marked on-road routes around active grain silos in Millersville and Owaneco. Near its northern end it runs along Lake Taylorville and the South Fork of the Sangamon River. It ends at 206 South Paw Paw Street in Taylorville, where the conservancy built a trailhead with a rain shelter, an accessible picnic table and an 11-space concrete parking lot.

Of the trail's four original bridges, the timber railroad trestle over Flat Branch, a tributary of the South Fork, deteriorated and was closed in 2015, leaving a gap near Taylorville for about ten years. Pana won a $1.1 million Illinois Transportation Enhancement Program grant in 2023; removal of the old bridge began in February 2025, and a new 200-foot bridge, with 72 feet of timber decking at each end, was finished that April. A ribbon cutting on May 27, 2025 reopened the full trail. The new bridge can carry 20,000 pounds, enough for a small emergency vehicle.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

Shade

10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pana, 14.9 km from the trail's middle, 7 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374253667684878681685342
Low °F192331415262656355443325
Precipitation, in2.82.134.84.85.1433.23.53.72.3
Snow, in5.12.62.60.5000000.10.92.7
Old maps

USGS topographic maps of the trail's middle go back to the 1947 Pana sheet (1:62,500); the 1949 Pana sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10150988, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Lincoln Prairie Trail Opens — Illinois Department of Transportation blog (July 25, 2025) · government source · checked Oct 14, 2026
    Supports: 15-mile multiuse path in Christian County between Pana and Taylorville; opened 2001 on an old railroad bed; Lincoln's Eighth Judicial Circuit route; four original bridges; Flat Branch timber trestle closed 2015; $1.1 million ITEP grant awarded 2023; removal in February, completion in April, 200-foot bridge with 72 feet of decking at each end; 20,000-pound capacity; May 27 ribbon cutting; Lincoln Prairie Trails Conservancy founded 2017 and its improvements; Lost Bridge Trail goal
  3. Lincoln Prairie Trail — TrailLink (Rails to Trails Conservancy) · web · checked Oct 14, 2026
    Supports: endpoints at IL 29 and East 350 North Road in Pana and South Paw Paw Street in Taylorville; paved; on-road routes around silos in Millersville and Owaneco; stretch along Lake Taylorville and the South Fork Sangamon River; Paw Paw Street trailhead facilities; City of Pana as owner

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.