States › Missouri

Line Creek Trail

Greenway in Missouri · OpenStreetMap relation

Runs through Kansas City and Riverside · Platte County

Conditions now

Loading the weather near Kansas City…

Forecast by the National Weather Service for Kansas City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
9.3 mi 15.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Northwest Argosy Parkway mile 0.2 directions to trailhead 1
  2. Parking at Northwest Argosy Parkway mile 0.2 directions to trailhead 2
  3. Parking at Northwest Argosy Parkway mile 0.2 directions to trailhead 3
  4. Parking at Northwest Argosy Casino Parkway mile 0.3 directions to trailhead 4
  5. Parking at Northwest Argosy Parkway mile 0.3 directions to trailhead 5
  6. Parking at Northwest Cliff View Drive mile 1.3 directions to trailhead 6
  7. Parking at Northwest Cliff View Drive mile 1.3 directions to trailhead 7
  8. Parking at Northwest Homestead Terrace mile 1.9 · water directions to trailhead 8
  9. Parking at Northwest Homestead Road mile 1.9 · water directions to trailhead 9
  10. Parking at Northwest Homestead Terrace mile 2 · water directions to trailhead 10
  11. Parking at Northwest Homestead Terrace mile 2.1 · water directions to trailhead 11
  12. Parking at Northwest Homestead Terrace mile 2.1 directions to trailhead 12
  13. Parking at Northwest Homestead Terrace mile 2.1 · water directions to trailhead 13
  14. Parking at Northwest Homestead Terrace mile 2.1 · water directions to trailhead 14
  15. Parking at Northwest Homestead Road mile 2.2 directions to trailhead 15
  16. Parking at Northwest Homestead Terrace mile 2.2 directions to trailhead 16
  17. Parking at Northwest Kalivas Drive mile 2.5 directions to trailhead 17
  18. Parking at Northwest Waukomis Drive mile 3 directions to trailhead 18
  19. Parking at Northwest Waukomis Drive mile 3.1 directions to trailhead 19
Line Creek Trail drawn on the 1954 USGS topographic map of Kansas City, Missouri
Then: the 1954 USGS Kansas City sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Line Creek Trail is a paved multi-use trail that follows Line Creek through Riverside and the Northland of Kansas City in Platte County, Missouri. The cities of Kansas City and Riverside own and operate it, with funding from both cities and Platte County, and Kansas City Parks and Recreation manages it. Platte County Parks lists it at 8.4 miles of concrete trail, used by walkers and bicyclists.

Kansas City's parks master plan describes the Line Creek greenway, a park established in 1975, as preserving more than 75 acres of creekside corridor and carrying the trail over 8 miles from Barry Road in the north to the Riverside city line in the south, with pavement in excellent condition and several connections to nearby neighborhoods. Kansas City Parks lists its part of the trail as running from I-29 and Line Creek to NW Tiffany Springs Road, open from 5 a.m. to midnight.

The southern end is on Argosy Parkway in Riverside. Access points along the route include Homestead Park and Renner Brenner Park in Riverside, the Line Creek Gower Avenue trailhead, the Kansas City Northern miniature railroad and the Line Creek Community Center. Most of the trail is a 10-foot-wide concrete path through woods, passing two small waterfalls; a stretch of about 2,000 feet follows an old interurban railroad bed, and the trail winds around the site of the former Drennon Lake. It has two pedestrian bridges and a Fixit bicycle repair station with an air pump and basic tools.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

41% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kansas City Downtown Airport, 10.6 km from the trail's middle, 32 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404557677686908980685444
Low °F222636465767727061493627
Precipitation, in11.52.13.95.15.34.44.73.83.21.81.3
Snow, in3.43.20.40.1000000.30.13.5
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Kansas City sheet (1:125,000); the 1951 North Kansas City sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 and 2025 described the trail as mostly flat with some climbs, one noting steeper grades north of the community center and another larger hills toward the waterfalls. r/kansascity, Mar 2024 · r/kansascity, Oct 2025
  • Riders in 2024 and 2025 described reaching Line Creek from English Landing Park in Parkville along the Missouri Riverfront levee trail to Argosy; one in 2025 said parts are gravel and sections often closed. r/kansascity, Mar 2024 · r/kansascity, Oct 2025
  • In October 2025 one rider suggested parking at Homestead Park for longer rides and using the community center as a central launch; another rider turned around at a Riverside cafe. r/kansascity, Oct 2025
  • One rider in October 2025 said the trail was quieter than Indian Creek Trail on evenings and weekends. r/kansascity, Oct 2025
5 Reddit threads about this trail, Jan 2024 to Mar 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9725144, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Line Creek Trail - Kansas City Parks & Recreation · organization · checked Oct 15, 2026
    Supports: Kansas City section from I-29 and Line Creek to NW Tiffany Springs Rd., concrete, hours 5 a.m. to midnight
  3. Page 180 - KCMO Parks Master Plan 2032 - Kansas City Parks & Recreation · organization · checked Oct 15, 2026
    Supports: greenway established 1975, over 75 acres of riparian corridor, over 8 miles from Barry Road to the Riverside city line, pavement condition, neighborhood connections
  4. Kansas City's Line Creek Trail soon to be 8 miles - Missouri Bicycle & Pedestrian Federation · organization · checked Oct 15, 2026
    Supports: 10-foot-wide concrete through woods, two small waterfalls, 2,000-foot stretch on an old interurban railroad bed, former Drennon Lake
  5. Line Creek Trail - Platte County Parks & Recreation · web · checked Oct 15, 2026
    Supports: owned and operated by Kansas City and Riverside, funding from Kansas City, Platte County and Riverside, managed by Kansas City Parks and Recreation, 8.4 miles, concrete, Argosy Pkwy address, access points, two pedestrian bridges, Fixit station, hikers and bicyclists

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.