States › New York

Lockport Rail Trail

Rail-trail in New York

Runs through Town of Lockport · Niagara County

Conditions now

Loading the weather near South Lockport…

Forecast by the National Weather Service for South Lockport · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.0 mi 1.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Town of Lockport, along the trail (opens in a new tab)
Town of Lockport, along the trail · Photo: Pubdog at en.wikipedia · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Lockport Rail Trail is a multi-use trail on an abandoned railroad bed in the town of Lockport, Niagara County, New York, running northeast from Lockport Road toward the city of Lockport; this record maps about 1.0 mile of paved trail from Lockport Road. TrailLink lists the trail at 2 miles between Lockport Road and NY 93.

The Town of Lockport is developing the trail. A state Recreational Trails Program grant of $168,591 for a second phase, under a contract signed in June 2022, paid for converting a segment of the rail bed to a multi-use trail with pavement striping, control gates, signage and detectable warning surfaces, and the state lists the project as complete; the phase was described as connecting with the Erie Canalway Trail. In January 2024 the town applied to the state Department of Environmental Conservation for a wetlands permit to pave about 0.53 acres of the rail bed between Murphy and Hinman roads, extending the trail from Murphy Road to the Lockport city line.

At its southern end on Lockport Road the trail meets the Pendleton Rail Trail, which the Town of Pendleton reports as 3.3 miles of paved path from Meyer Road to Lockport Road. Parking is at the trailhead at 5300 Lockport Road. TrailLink describes the path as 8 feet wide, paved for about half a mile from Lockport Road to Murphy Road and gravel beyond.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

ERIE Lockport Branch, Lockport Running Track and Lockport Industrial Track (Conrail). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
N Tonawanda, 13.9 km from the trail's middle, 4 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333644577079838274614938
Low °F171724344555595850403123
Precipitation, in3.22.42.93.63.43.33.53.13.93.93.53.4
Snow, in22.916.113.12.7000000.5618.5
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Lockport sheet (1:62,500); the 1950 Lockport sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rail Trail: Phase 2 — New York State Regional Economic Development Councils · government source · checked Oct 14, 2026
    Supports: Town of Lockport sponsor, $168,591 Recreational Trails Program award, contract executed June 17, 2022, conversion of a segment of abandoned rail bed to a multi-use trail connecting with the Erie Canalway Trail, striping, control gates, signage and detectable warning surfaces, status complete
  3. City of Lockport - Lockport Rail Trail — NYS DEC Environmental Notice Bulletin, January 3, 2024 · government source · checked Oct 14, 2026
    Supports: Town of Lockport applicant, abandoned railroad bed, paving about 0.53 acres between Murphy Road and Hinman Road, extension from Murphy Road to the City of Lockport line, freshwater wetlands permit
  4. Rails to Trails — Town of Pendleton, NY · government source · checked Oct 14, 2026
    Supports: 3.3 miles of paved pathway from Meyer Road to Lockport Road
  5. Lockport Rail Trail — TrailLink · web · checked Oct 14, 2026
    Supports: 2 miles between Lockport Road and NY 93, 8 feet wide, paved about half a mile from Lockport Road to Murphy Road and gravel beyond, connection with the Pendleton Rail Trail at Lockport Road, parking at 5300 Lockport Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.