States › California

Los Angeles River Greenway

Greenway in California · OpenStreetMap relation

Runs through Los Angeles, Vernon, Bell, Cudahy, South Gate, Paramount, Compton and Long Beach · Los Angeles County

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
35.0 mi 56.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Owensmouth Avenue mile 0 directions to trailhead 1
  2. Parking at Owensmouth Avenue mile 0 directions to trailhead 2
  3. Parking at Owensmouth Avenue mile 0 directions to trailhead 3
  4. Parking at Remmet Avenue mile 0.1 directions to trailhead 4
  5. Parking at Victory Boulevard mile 2.8 directions to trailhead 5
  6. Parking at Victory Boulevard mile 2.9 directions to trailhead 6
  7. Parking at Sepulveda Boulevard mile 8.3 directions to trailhead 7
  8. Parking at Ventura Boulevard mile 12 directions to trailhead 8
  9. Parking at Valleyheart Drive mile 12.7 directions to trailhead 9
  10. Parking at Republic Avenue mile 13.4 directions to trailhead 10
  11. Dog Park Parking mile 19.4 directions to Dog Park Parking
  12. Parking at Zoo Drive North mile 19.7 · restrooms · water directions to trailhead 12
  13. Parking at Crystal Springs Drive mile 21.8 directions to trailhead 13
  14. Parking at Rosanna Street mile 23.9 · restrooms directions to trailhead 14
  15. Parking at Rosanna Street mile 24 · restrooms directions to trailhead 15
  16. Public Parking directions to Public Parking
  17. Parking at Golden Shore directions to trailhead 17
  18. Parking at Rancho Caballo Road directions to trailhead 18
  19. Parking at San Juan Street directions to trailhead 19
  20. Parking at Shoreline Drive directions to trailhead 20
  21. Parking at Shoreline Drive restrooms directions to trailhead 21
  22. Parking at Shoreline Drive directions to trailhead 22
  23. Parking at Monroe Avenue directions to trailhead 23
  24. Parking at Monroe Avenue directions to trailhead 24
  25. Parking at Century Boulevard directions to trailhead 25
  26. Parking at Imperial Highway directions to trailhead 26
  27. Parking at Imperial Highway directions to trailhead 27
  28. Parking at Burtis Street directions to trailhead 28
  29. Parking at Southern Avenue directions to trailhead 29
  30. Parking at Cecilia Street directions to trailhead 30
  31. Parking at River Road directions to trailhead 31
  32. Parking at East 59th Place water directions to trailhead 32
  33. Parking at East 52nd Drive directions to trailhead 33
  34. Parking at East 52nd Drive directions to trailhead 34
  35. Parking at East 72nd Street directions to trailhead 35
  36. Parking at Aquarium Way restrooms · water directions to trailhead 36

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

Los Angeles River Greenway (opens in a new tab)
Photo: gyllen · CC BY-SA 4.0 · Mapillary

About this trail

The Los Angeles River Greenway is the name OpenStreetMap gives to the set of bike paths along the Los Angeles River, which runs from the San Fernando Valley past Griffith Park to its mouth at Long Beach. The paths are not yet continuous: Metro describes an eight-mile gap in the river's active transportation network between Elysian Valley and the City of Vernon, where cyclists must use surface streets. It is a river greenway, not a rail-trail. In 2013 the nonprofit River LA set a goal of a continuous 51-mile greenway and bike path along the river.

This record maps about 35 miles in three groups. The longest completed section, the Los Angeles River Bikeway, runs about 17 miles from the river mouth in Long Beach upstream to Atlantic Boulevard, with parking at DeForest Park in Long Beach, Ralph C. Dills Park in Paramount and Hollydale Park in South Gate; on the east side it connects with the Rio Hondo Bicycle Path. The 7.4-mile Elysian Valley Bicycle & Pedestrian Path runs through the Glendale Narrows from Victory Boulevard and Riverside Drive, at the Burbank–Glendale line, past Griffith Park, Los Feliz and Atwater Village to Egret Park in Elysian Valley; the Baum Bicycle Bridge at Los Feliz Boulevard was built in 2002. The rest of the record is separate short pieces in the San Fernando Valley, including a 1.5-mile stretch in Canoga Park from Mason Avenue to Owensmouth Avenue that opened in April 2022 and a half-mile section in Studio City between Whitsett Avenue and Coldwater Canyon Avenue that opened in 2019.

Metro's LA River Path project would close the gap. Metro released its draft environmental impact report on December 18, 2025, with public review through February 2, 2026; a vote on a locally preferred alternative is expected in fall 2026, and Metro estimates completion of an initial phase in 2031.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Los Angeles Dwtn Usc Campus, 3.5 km from the trail's middle, 20 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F686870727477828483797367
Low °F495052555861656564605348
Precipitation, in3.33.62.20.70.30.1000.10.60.82.5
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Los Angeles sheet (1:62,500); the 1953 Los Angeles sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2025 and 2026 suggested parking in Griffith Park, at the Bette Davis Picnic Area (one called it free) or on Zoo Drive near the path entrance. r/BikeLA, Mar 2025 · r/AskLosAngeles, Feb 2026
  • Riders from 2022 to 2025 named North Atwater Park (beside the horse bridge), Rio de Los Angeles Park (bridge to the path) and Lewis McAdams River Park, which has a lot and restrooms. r/BikeLA, Nov 2022 · r/BikeLA, Mar 2025
  • Riders in 2024 and 2025 said the path stopped at Cypress Park, short of downtown; one could not find its southern end near Vernon, and another found the entrance near Avenue 19 hard to spot. r/BikeLA, Mar 2024 · r/BikeLA, Mar 2025
  • Riders in 2024 and 2025 combined the path with Metro rail, taking bikes to Lincoln/Cypress or downtown stations; one said all-day parking at Union Station East cost $8. r/BikeLA, Mar 2024 · r/BikeLA, Mar 2025
5 Reddit threads about this trail, Nov 2022 to Feb 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Los Angeles River Greenway (opens in a new tab)
360° panorama · Photo: gyllen · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1962979, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Los Angeles River Bike Path — Wikipedia · organization · checked Oct 15, 2026
    Supports: Long Beach to Atlantic Boulevard section as longest completed; parking at Hollydale, Ralph C. Dills and DeForest parks; Rio Hondo Bicycle Path connection; 7.4-mile Elysian Valley Bicycle & Pedestrian Path from Victory Blvd and Riverside Drive to Egret Park; Baum Bicycle Bridge 2002; Canoga Park 1.5 miles Mason to Owensmouth opened April 2022; Studio City half mile Whitsett to Coldwater Canyon opened 2019; sections not connected; River LA 51-mile goal set in 2013
  3. LA River Path — Metro (Los Angeles County Metropolitan Transportation Authority) · web · checked Oct 15, 2026
    Supports: eight-mile gap between Elysian Valley and the City of Vernon; cyclists use surface streets; planning phase; draft EIR released December 18, 2025, review through February 2, 2026; locally preferred alternative vote expected fall 2026; initial phase completion estimated 2031
  4. Los Angeles River Greenway, relation 1962979 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: greenway name; mapped length of about 35 miles in three groups; about 17 miles from Long Beach to Atlantic Boulevard on the map line

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.