States › Ohio

Loudonville Mohical Bike Path

Greenway in Ohio

Runs through Loudonville · Ashland County

Conditions now

Loading the weather near Loudonville…

Forecast by the National Weather Service for Loudonville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.8 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Mount Vernon Avenue mile 1.3 directions to trailhead 1
Loudonville, along the trail (opens in a new tab)
Loudonville, along the trail · Photo: Chris Light (talk) · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Loudonville Mohican Bike Path is a paved multi-use trail that links downtown Loudonville, Ohio, with Mohican State Park. The Ohio Department of Natural Resources, which owns it and manages it through the Division of Parks and Watercraft as one of the park's trails, describes a two-mile trail open to walking and biking that begins at Riverside Park in Loudonville; it rates the trail easiest and lists it as wheelchair friendly. OpenStreetMap spells the name Mohical.

The mapped route runs about 1.7 miles southwest from Loudonville toward the park. The path ends on the west side of State Route 3, so riders bound for the park have to cross the highway, and a Loudonville council member has called the stretch that shares the roadway with Route 3 toward the park entrance the most dangerous section of the current path.

In September 2025 the Mohican Area Growth Foundation was looking for money for a connector to the park; one option was a trail in the corridor of new AEP transmission lines on the east side of State Route 3. An earlier Clean Ohio Trails Fund application had been declined because the park is state-owned land. In June 2026 the village's Riverside Park Connector, a 0.3-mile link from near the Riverside Park parking lot to Spring and Main streets along an alley and village right-of-way, received $300,000 from Ohio's capital budget; its construction timeline had not been set.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Danville 2 W, 21 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343848617079828175635039
Low °F171826364656595749382923
Precipitation, in3.12.53.344.74.94.23.43.22.933.2
Snow, in12.910.66.51.20000002.38.1
Old maps

USGS topographic maps of the trail's middle go back to the 1912 Loudonville sheet (1:62,500); the 1961 Greer sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Parks_DNAP_Trails FeatureServer layer 3, Loudonville Mohican Bike Path record — Ohio Department of Natural Resources · government source · checked Oct 17, 2026
    Supports: name Loudonville Mohican Bike Path, owner ODNR, manager Division of Parks and Watercraft, Mohican State Park, paved, multi-use, easiest, wheelchair friendly, two miles, begins at Riverside Park and connects downtown with the park, walking and biking
  3. Mohican Area Growth Foundation works to secure grant for more bike paths — Ashland Source (Sept. 3, 2025) · web · checked Oct 17, 2026
    Supports: path ends on west side of State Route 3, crossing to the park, AEP transmission corridor option, Clean Ohio Trails Fund application declined for state-owned land
  4. Loudonville trail connector project gets $300K boost via Ohio capital budget — Ashland Source (June 30, 2026) · web · checked Oct 17, 2026
    Supports: Riverside Park Connector 0.3 miles, route along alley and village right-of-way to Spring and Main streets, $300,000 capital budget, timeline not finalized, council member's remark on the Route 3 shared-road section
  5. Way: Loudonville Mohical Bike Path (368601859) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: OpenStreetMap spelling, mapped length and direction

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.